1983: From Land Sharing to Household Ownership
Chapter 507: Can't Blind Goldfinger
"Start work?"
Wang Qiang shook his head and said, "This matter can't be rushed. It is most appropriate to wait until the work in the county is in place before starting the construction."
He said to Secretary Zhao, "However, the bridge from the county town to Yanyan Village can start construction, and the Xihe Bridge to Yuecheng can also start construction."
"The direction leading to Yanyan Village in the county is still a pontoon bridge. There is no qualified bridge, which is very inconvenient. The bridge leading to Yuecheng is very narrow and must be rebuilt in order to keep up with the needs of future social development. "
Wang Qiang wanted to build the Yanyan Bridge for a long time, lest because of the inertia of history, many years later, the supervisor of the tea city transferred from the neighboring province, using the excuse of building it, to continue to view the eight scenic spots of the tea city one by one. Destroy it, then leave a bridge of terrible quality, slap the butt, get promoted and leave.
Only by completing the construction of a high-quality Yanyan Bridge first, can we truly change history.
That guy who deserves to be slashed with a thousand swords, all means of destroying the eight major scenic spots in the tea city is to build roads and bridges.
As a result, the roads and bridges built are all roads and bridges of terribly poor quality, and as a result, they exhausted the finances of the tea city for the next ten years.
The Yanyan Bridge in the memory of later generations, in the second year of its construction, several piers and bridge decks were cracked, and even large cars could not drive past.
Until 2023, it will be in a semi-closed state, witnessing the huge humiliation suffered by the tea city.
I have an amazing golden finger. If I can't even make this change, I am really blinding my golden finger.
In the memory of later generations, the same is true of the newly built Xihe Bridge leading to Yuecheng. In the second year after completion, there were many cracks.
However, because the road and bridge leading to Moon City is too important, it must be unobstructed. After more than a dozen major repairs, the traffic of various vehicles has been reluctantly restored.
Not far from the Xihe Bridge, there is one of the eight scenic spots: fishermen scattered nets.
This lifelike natural scenery is not bad at all compared to fishing in Yanyan, but unfortunately it was also ordered to be blown to pieces by that darn guy, just because he wanted to mine stones for the construction of the Xihe Bridge.
The fishermen cast their nets. This famous scenery since ancient times is located on the edge of the ancient pavilion 500 meters downstream of the Xihe Bridge. There is only a bluestone trail built by the ancients. Even a tractor can't drive through it. Go there to mine stones to build the road. ?
What a wonderful reason this is!
In the memory of the market outlook, the other six natural landscapes handed down from ancient times also suffered bad luck one by one, and were all destroyed by various strange reasons.
This made Wang Qiang, after having a certain status and money that he could not use up, immediately decided to invest his own money to undertake all the road and bridge construction work in the entire tea city, and build the roads and bridges leading to all directions into a High quality first class road bridges.
If he has achieved this, he can't change the inertia of history and preserve the eight natural scenery of the tea city. Wang Qiang can completely consider his own way back.
For example, it is also a good choice to go abroad to Africa, fully develop the golden finger, build a superpower with your own hands, and build a veritable Han Empire.
"Start building roads and bridges first? That's fine!"
Secretary Zhao only reacted at this time, because he was impatient.
Indeed, it is very unwise to start the construction hastily before the land acquisition and resettlement work has been completed.
This kind of huge project construction must be straightened out in all aspects before starting the construction.
After all, when the mighty mechanized engineering team settles in, the first thing to do is to draw the lines on the spot, and then start the construction.
This is not playing a house, but the largest construction project in the history of Tea City, and there is no room for sloppy care.
"Aqiang, you have submitted the plan for building roads and bridges within the tea city. You have submitted and approved it. The directors of the Land Bureau and the Construction Bureau will fully cooperate with your company's work."
"The compensation work for land acquisition along the roads is being rolled out in the county. I think it will not take three days before the two bridges near the county seat can be officially started."
Secretary Zhao knows very well how determined the county is this time.
Director Xiao strictly ordered all relevant departments to fully cooperate with Wang Qiang's company's work, and within three months, all the land acquisition and compensation involved must be in place.
After all, even if Wang Qiang did not undertake the comprehensive construction of roads and bridges this time, the counties that are now rich are preparing to start some construction projects.
That is to say, land acquisition along the road is a must, and the sooner the better.
Now that the comprehensive construction is funded by Wang Qiang personally, it is too late for everyone to be happy. How can anyone object to it stupidly?
The large amount of funds saved by the county can be fully invested in the renovation of urban areas and the construction of new rural areas.
This is like a pie falling from the sky, with all the benefits and no harm.
"Well."
Wang Qiang nodded and said, "In the past few days, I have tried to build more than a dozen road rollers and concrete grouting trucks by myself, and let the company set up a finished concrete material processing plant, in order to fully realize mechanized construction and speed up the construction of various projects. "
These two kinds of professional equipment, Wang Qiang wanted to get them out, but unfortunately he has not been free.
Today's construction scale is unprecedented, and it is much larger than the previous construction scale.
It is necessary to get these two kinds of professional machinery and related processing plants out, in order to speed up the progress of the project, so as not to waste a lot of labor and time.
Today, nearly 2,000 people in the company are idle, and building a medium-to-large concrete finished product processing plant could not be easier.
The drawings of these two special vehicles, as well as the construction drawings of the finished concrete processing plant, he had taken time to complete the design and drawing in the evenings a few days ago because he had nothing to do.
Then, just build and assemble them like you did before building a lot of excavators.
"Good! That's good."
When Secretary Zhao heard that Wang Qiang was well prepared, he immediately said ok, "Aqiang, I will go back and report to Director Xiao first, and then I will personally urge the various land acquisition work groups to complete all land acquisition compensation work as soon as possible."
"Aqiang, your plan is so perfect. It's the first time to set up a real mechanized construction team in the tea city."
"However, I have enough reasons to expect that the real mechanized construction will have a huge impact on future engineering construction."
After saying that, Secretary Zhao and Wang Qiang said goodbye, turned around and left in a hurry.
He came here today, not only to send relevant certificates and approvals to Wang Qiang, but also to understand Wang Qiang's plans, so that he can completely reassure Director Xiao and Director Peng.
After all, this wave of projects is too large to be implemented without a detailed plan.
Secretary Zhao drove away, and Wang Qiang went directly to the core factory area, started the super machine tool, took out the relevant drawings that he had already put here, and began to build the spare parts for two special vehicles.
Just like building those excavators before, because there are so many special vehicles to be assembled, all kinds of raw materials are available in the factory, which is much more convenient than working at home.
Therefore, in the current situation, it is most appropriate to start construction in this core factory area.
You'll Also Like
-
Douluo: Undercover Wuhun Palace, who asked you to marry the Pope?
Chapter 290 1 hours ago -
Douluo: I can hear Qian Renxue's voice
Chapter 366 1 hours ago -
Peerless Tangmen: Dragon Bear Douluo
Chapter 153 1 hours ago -
Douluo: The Peerless Tang Sect dug out Yu Xiaogang
Chapter 212 1 hours ago -
Douluo started from being accepted by Bibi Dong as a disciple
Chapter 35 1 hours ago -
Douluo Continent on the tip of the tongue
Chapter 594 1 hours ago -
Douluo: My mother is the time traveler
Chapter 215 1 hours ago -
Douluo: Rebellious son of the Tang family
Chapter 668 1 hours ago -
Super synthesis system
Chapter 658 1 hours ago -
I want to be the overlord when I transform into Marvel
Chapter 1335 1 hours ago