1983: From Land Sharing to Household Ownership
Chapter 510 Start work after getting it done
"Boss, did you get off work so early today?"
He Liping had just visited the workshops of the automobile factory, and she saw Wang Qiang when she came out, and said hello.
She knew that Wang Qiang had been busy recently, but she did not continue to work overtime every day as before.
However, today is a little strange. Before four o'clock in the afternoon, he came out of the core factory area.
"Well, after nearly a week of busy work, I finally finished processing all the spare parts for the twelve road rollers and sixteen large concrete grouting trucks. Using the transmission equipment, they were sent to the two large assembly workshops outside."
"The rest of this afternoon, the technicians who participated in the assembly of the excavator last time will be called to assemble two special vehicles."
"It is estimated that it will take about three days to complete."
"In the future, the construction of various projects on the site will be mechanized, and the efficiency will increase by at least 30%."
Wang Qiang emphasized to He Liping and asked, "Today, the construction of the Yanyan Bridge and the Xihe Bridge has officially started. Are all the technicians responsible for the bridge construction present?"
In order to build bridges and roads, Wang Qiang deliberately used the appraisal technique again yesterday, and personally selected dozens of technicians and leaders from the company's two large-scale professional construction teams.
"Boss, don't worry."
He Liping said quickly, "Today's groundbreaking ceremony was hosted by me personally. Among the company's two professional construction teams, the 800-person construction team responsible for building bridges and roads is divided into two groups, each responsible for one building. Construction of the bridge."
"Everyone arrived at the site on time, and started working with excavators in strict accordance with the drawings you drew."
"Boss, the construction planning drawings you drew are easy to understand. I'm not a professional, so I can see it clearly, not to mention those professional leaders?"
"Mo Xiaoyong, the head of the quality inspection department, and Meng Jian, the deputy head, both graduated from the University of Civil Engineering. I have strictly ordered them to pay close attention to the progress and quality of the project."
"That's good." Wang Qiang nodded, "You have to explain, the construction of roads and bridges can't be sloppy!"
"Once there is a quality problem, I will directly hold the responsible person responsible and will never tolerate it!"
He explained some things to He Liping, and then walked towards the assembly workshop outside.
Now that the company is on the right track, he won't go out in person for normal things.
Just like today, he also told He Liping to lead someone to preside over the commencement ceremony of the two bridges.
Knowing people and making good use of them, he understands this.
In the past, there was no way, many jobs could not be replaced by others, and you had to do it yourself.
In addition, in the past year, the company has been in a state of preparation and has not yet entered the right track, so I have to worry more.
Anyway, the most important planning and design drawings, he has already done all of them, and handed them over to the person in charge of the quality inspection department and the engineering team in duplicate.
If they cause problems again, it will not be as simple as taking a pay cut and dismissal.
In serious cases, not only will they be fired, but they will also have to notify the patrol room to take the person away and pursue legal responsibility.
These words, he said to all the executives of the company.
Perfect rules and regulations and never arrears of wages, bonuses and benefits are the main reasons why the company has been running well so far.
After a while, he came to an assembly workshop that was equivalent to the company's experimental workshop. There were already a large number of spare parts, which were neatly classified and numbered and placed in the large workshop.
There are also dozens of technicians who participated in the assembly of dozens of excavators last time. All of them have arrived and waited for a while.
Without saying a word, he took everyone directly and started the assembly of two special construction vehicles.
Now, the planned road and bridge construction has begun.
A large number of land acquisition and demolition work in the county are also in full swing.
A few days later, with all the villagers in Heping Village moving out, a massive construction round will be officially launched.
Therefore, as an important part of mechanized construction: the assembly of two special construction vehicles is already imminent.
They must be done as soon as possible, so as not to affect the progress of the various construction projects.
The dozens of technical staff here are already proficient, and everyone's cooperation is relatively tacit.
Under Wang Qiang's hands-on and command, the assembly of special vehicles is very efficient.
It wasn't until half past five when it was time to get off work, and everyone dispersed immediately.
...
"Boss, this is the factory that Loncin was originally building. We can see it. Plus, there are two stone mountains nearby, all of which are big bluestones. It is very convenient to mine the stones, so we built the finished concrete material processing factory here. , it is also considered waste utilization.”
Rao Min is the temporary person in charge of the factory under construction. He said to Wang Qiang, who had just come to inspect the finished concrete material processing factory.
After the workshop was rebuilt according to the construction drawings, Wang Qiang sent a large-scale stone crusher, a large-scale belt conveyor, etc. on the same day. It took hundreds of people another three days to finally process a medium-to-large concrete finished material. Factory construction completed.
Wait a minute, it's the final production line test.
There are large warehouses for storing cement, as well as large sand and gravel fields.
Various raw materials will be quantitatively transported to the high rotating discharge port using conveying equipment.
Then, the driver drives the large concrete filling truck to a fixed location, and aligns the large oval tank feeding place on the truck with the discharge port of the large hopper above.
The fully mixed concrete raw materials will pass through the large funnel at the upper discharge port and quantitatively enter the large oval tank of the concrete filling truck, and then pour a quantitative amount of clean water into the large tank.
Then, the driver of the concrete filling truck presses the corresponding power switch, and the large tank will rotate slowly on the truck, which will not allow the concrete to solidify in the large tank, but also allow the various materials that make up the concrete. was stirred more evenly.
Wait for the driver to drive the concrete filling truck to the site where concrete is needed, turn on the air pump on the truck, and spray the finished concrete in the large tank to the corresponding place through the pipeline.
Because the large oval tank of the large concrete filling truck is very large, the pouring speed of concrete is extremely fast, which greatly increases the speed of construction.
An hour later, the test of the production line had been completed, and Wang Qiang, who had not found any problems, explained a few words to the temporary person in charge here, Rao Min, and drove away from the newly built medium and large-scale factory, heading for his home.
It took about half a month of continuous work to get these trivial things done, and he can really relax.
Secretary Zhao of the county, Director Meng of the Land Bureau, and Director Huang of the Construction Bureau went to the Land Bureau three days ago to complete the handover of the land transfer procedures together with the relevant personnel of the company.
Yesterday, while paying off the land transfer fee, the company obtained various certificates and approvals such as the land transfer certificate and the permit for construction.
That large 430,000 mu of land already belongs to the company.
After consultation with Wang Qiang in the county, after watching the auspicious day of the yellow road, everyone decided to hold a grand groundbreaking ceremony at nine o'clock tomorrow morning on the side of the road leading to Yinquan Mountain from Ping'an Village.
A new round of massive construction will officially kick off.
You'll Also Like
-
Douluo: Undercover Wuhun Palace, who asked you to marry the Pope?
Chapter 290 1 hours ago -
Douluo: I can hear Qian Renxue's voice
Chapter 366 1 hours ago -
Peerless Tangmen: Dragon Bear Douluo
Chapter 153 1 hours ago -
Douluo: The Peerless Tang Sect dug out Yu Xiaogang
Chapter 212 1 hours ago -
Douluo started from being accepted by Bibi Dong as a disciple
Chapter 35 1 hours ago -
Douluo Continent on the tip of the tongue
Chapter 594 1 hours ago -
Douluo: My mother is the time traveler
Chapter 215 1 hours ago -
Douluo: Rebellious son of the Tang family
Chapter 668 1 hours ago -
Super synthesis system
Chapter 658 1 hours ago -
I want to be the overlord when I transform into Marvel
Chapter 1335 1 hours ago