1983: From Land Sharing to Household Ownership
Chapter 643: Solving the Urgent Need
"Everyone will work harder and strive to complete the sewer project of this big port today!"
"The boss has already notified that the seawater conversion production line will be activated in the morning the day after tomorrow. We must not let the sewer project in charge of our engineering team be delayed!"
Wu Shuqiang also came to North Africa together, and now serves as the captain of the third 10,000-strong engineering team.
He is a senior architect with real materials, the kind that doesn't make any discounts.
He led the team to complete almost all the main projects of the three super schools in Tea City, and the quality is impeccable.
It can be said that when it comes to the practical ability to engage in construction, among the 110,000 people here, except for Wang Qiang, even if he is the most awesome.
And he was also appointed by Wang Qiang as the deputy commander-in-chief of this super-large port, and also served as the captain of the third mechanized construction brigade.
He is now in charge of the construction of the port and the first seaside city at the base.
From a construction team with only 300 people in his hand, he suddenly became a core management staff with 10,000 people to command. Wu Shuqiang was of course very excited.
The number of people under his jurisdiction has increased by more than 30 times at once, and it is not too cool to do things.
Moreover, the construction team of 10,000 people under his command is more mechanized and more disciplined. Naturally, there is no need to say more about work efficiency.
In just one day and one night, the extremely large-scale sewer project here has entered the final capping stage.
Because the construction of the cement plant has not been completed yet, the concrete materials brought by the large fleet from China are limited, and the sewer works are not completely poured with concrete as before.
However, using bluestone slabs and cement mortar for masonry, the durability of the sewer is better.
The efficiency of 10,000 people working together is really hard to say. Rao is Wu Shuqiang, who strives for perfection and completes the huge sewer project here with high quality, but it only takes three days and three nights.
After the completion of the sewer here, large trucks can pass through it. It is really a century-old project.
In the next few hundred years, under normal circumstances, there will be almost no need to renovate again.
The boss explained that before the seawater conversion production line is officially launched, all the sewer works at the large construction site must be completed, so as not to affect future construction.
Moreover, the fourth mechanized construction team led by Liang Dingming, responsible for the construction of the coastal flood control dam and the Binhai Avenue project, must also be completed within these three days.
There is also the fifth construction team led by Zhang De, who is responsible for the construction of road and bridge projects in this area. The same is true, and it must be completed within these days.
Although the main materials of these construction projects are bluestone slabs, but because they are all mechanized construction, coupled with the large number of people, the quality and speed of construction can be guaranteed.
Huang Yonghui, another leader of the mechanized construction team in Tea City, also came to the overseas base.
Of course, the boss would not treat the construction expert badly, and handed over the sixth construction team to him to lead.
The sixth construction brigade, led by Huang Yonghui, built a large cement plant and a large lime plant at the foot of two nearby limestone mountains.
There is also a need to build a large red brick factory on a large area of loess that has just been excavated by excavators in a weathered hilly highland.
I heard that these three large-scale basic building materials factories are not only large, but also install dust removal equipment invented by the boss.
The boss said that in the future, as long as all factories in the large base are installed with this kind of dust removal equipment, there will be no more smoke and dust everywhere.
And here in the overseas base, all future sewage treatment tanks will be put into the five-level sewage treatment tank of the Chacheng Automobile Factory, and the magical algae will be cured.
Therefore, even if several large factories are built near this overseas big port and the first overseas big city, it will not produce any pollution.
Now all the technical staff of the company know how awesome the boss is, and they admire them all.
The construction of several large factories in charge of Huang Yonghui will take about half a month to complete.
This is because the large fleet brought a lot of refractory bricks from China to be able to proceed smoothly.
The seventh mechanized construction team, now led by Zhong Jixiang, is building a large coal mine 30 kilometers away.
It is estimated that the boss has already figured out that there is not only a large coal mine with large reserves here, but also a huge iron mine 120 kilometers away.
However, the seven 10,000-strong engineering construction teams that stayed here in Dagang have something to do. A large-scale comprehensive smelting plant will complete the task here after the two 10,000-strong construction teams led by Rao Min and Luo Zun. Let's build together.
This is not urgent, mainly because several large-scale infrastructure material factories have not been completed and put into production.
The infrastructure materials brought from China will soon be used up.
Therefore, it has to wait until several large factories here are completed and put into operation before there can be enough various infrastructure raw materials to use.
Today, dozens of advanced quarry ships and sand quarry ships speeding around the bay are the busiest in this huge construction site.
Because now the bluestone blocks required for construction, as well as various sizes of sand and gravel, need to be mined by them.
Then, these bluestone blocks and sandstones will be handed over to a team of thousands of security guards who stay behind. After cleaning, screening and polishing, they will be handed over to various construction teams for use.
A full two hundred engineering dump trucks, driven by a security guard, ran back and forth between the various construction sites and the huge gravel field by the sea.
Under the overall arrangement of He Lizhen, the general manager of the overseas base, the huge construction site here is really busy and noisy.
...
"Boss, our third construction team, responsible for the sewer project of the big port and big city planning, has been completed!"
"Boss, our fourth construction brigade, responsible for the flood control dam and coastal avenue project on this section of the Baili seashore, has also been completed!"
"Boss, our fifth construction team, responsible for the road and bridge projects in this area, has also been completed!"
On the fourth day that the convoy came to this big bay, at eight o'clock in the morning, Wu Shuqiang, Liang Dingming and Zhang De stood in front of Wang Qiang and reported.
The three construction teams, working overtime day and night, finally completed the first phase of the project they were responsible for.
Mo Xiaoyong from the Quality Inspection Department led a team of 100 people from the Quality Inspection Department to complete the inspection before eight o'clock this morning.
"Well, that's good. Next, the third construction brigade led by you, Wu Shuqiang, and the fourth construction brigade led by Liang Dingming are responsible for the construction of this 900-square-kilometer port city."
"I have finished the planning drawings, and I have already made six copies. You two will take three copies each."
Wang Qiang handed over two stacks of urban construction planning drawings to Wu Shuqiang and Liang Dingming respectively.
Then, he said to Zhang De, "Zhang De, you lead the fifth construction brigade under your command to build thirty agricultural bases of 100,000 mu along the banks of the three Grand Canals."
"Zhang De, the agricultural base is the key to our overseas base, and it is the top priority. You have to listen to the opinions of the three directors of the agricultural base, Zhao Li, Zhao Juan, and Zhao Hong, and try to build them into the best!"
"Negotiate more! The three sisters, Zhao Li, Zhao Juan, and Zhao Hong, have been in charge of all agricultural bases in the Yuecheng area for three years. Their rich experience in agricultural production management is beyond doubt!"
"This is the planning and construction of 30 identical ecological agriculture bases of 100,000 mu. It must be completed as quickly as possible!"
"The temperature here will not affect the planting and cultivation this year. Our company strives to achieve a bumper harvest before the Chinese New Year and truly achieve self-sufficiency in overseas bases!"
"So, among all the construction teams here, your task is the most important!"
After all, he handed over a stack of agricultural base planning and construction drawings to Zhang De.
As the leaders of the three ten thousand construction team left with a solemn expression, Wang Qiang walked towards the gate of the black-tech seawater conversion production line automation factory that only he could enter.
Then, he first started the black technology solar generator, and then started the intelligent automatic production management system of the black technology production line.
Just a few minutes later, there were thunderous cheers from outside:
"There is water!"
"Wow... What a huge amount of water! It won't take long for the water in the artificial lake to overflow and flow into the three grand canals!"
"The water is so clear! It's not worse than the best mountain spring water I've ever seen!"
"Great, everyone can finally take a good bath!"
"In the past few days, because there is not enough Danshui, we can't even take a bath in the sea. All of us haven't bathed for three days, and our bodies stink to death!"
"Today, I have to go for a swim in the sea first, and then go to the large Danshui swimming pool that was just built by the sea to clean it!"...
There is no doubt that with the launch of this black-tech seawater conversion system with huge water output, it has truly solved everyone's urgent needs.
Because of the need to save water these days, everyone did not take a bath for three days.
It's good now, now that there is an endless supply of Danshui, it's no wonder that everyone is unhappy and broken.
You'll Also Like
-
Abnormal Food Article
Chapter 231 2 hours ago -
Peerless Tangmen: Dragon Bear Douluo
Chapter 153 4 hours ago -
Douluo: The Peerless Tang Sect dug out Yu Xiaogang
Chapter 212 4 hours ago -
Douluo started from being accepted by Bibi Dong as a disciple
Chapter 35 4 hours ago -
Douluo's super god level choice
Chapter 94 4 hours ago -
Douluo Continent on the tip of the tongue
Chapter 594 4 hours ago -
Douluo: My mother is the time traveler
Chapter 215 4 hours ago -
Douluo: Rebellious son of the Tang family
Chapter 668 4 hours ago -
Zhu Zhuqing of Douluo started to sign in
Chapter 149 4 hours ago -
Disabled Mr. Zhan is the Child’s Father, It Can’t Be Hidden Anymore!
Chapter 672 15 hours ago