Chaoshen Technology Trading Mall
Chapter 282 Introduction
After entering the exhibition hall, Mr. Qin and others found that besides the tg-001 engine developed by Tiangong Technology, there were seven or eight types of aero engines in the exhibition hall at this time, and these engines not only had turbochargers similar to the tg-001 Spray the engine.
At the same time, in the exhibition hall, there are also multiple turbofan engines, and the sizes of these turbofan engines are also different. It's about the same size, and some turbofan engines don't say anything else. The diameter of the fan in the front part of the engine alone reaches the level of three meters. This is definitely very shocking to Qin Lao and others.
So Mr. Qin asked Wang Bin: "Mr. Wang! Are all the engines in this exhibition hall already developed by your Tiangong Technology?"
"No! Mr. Qin! Although most of the engines in this exhibition hall have been successfully developed by us and have even entered the production process, not all of them have been successfully developed. I have completed the concept map and the design of the concept model.
Take this tg-s005 large turbofan engine that surpasses our Tiangong technology as an example. The diameter of the fan of this engine alone reaches 3 meters. If the casing and so on are added, the overall diameter of this engine It has already exceeded 3.4 meters, and it is almost 3.5 meters larger. In terms of maximum thrust, this engine has reached about 45 tons, and its thrust has reached the same level as the actual maximum thrust engine x9.
At the same time, in terms of other performance, this engine also reaches or exceeds the level of x9, especially in terms of fuel consumption performance, it is about one-third less than the other side, which is a very good engine.
It's just that although we have already manufactured the model of this engine, it is just a model. In fact, our company's research and development work on this engine is just in the drawing design stage. If you want to successfully design this engine, it will only take more than half a year. If you add manufacturing and trial runs, the time required will be even longer. According to my estimation, I want at least one to two years. Year time line.
Of course, if you want to enter mass production, it will take longer. "Wang Bin came to the exhibition hall, next to the largest turbofan engine, and said to everyone.
After finishing speaking, Wang Bin came to another engine with a nozzle diameter of about 1.5 meters and the longest length among all engines, and said: "Besides, this small bypass ratio turbofan engine, this engine is in our The internal model of Tiangong Technology is the tg-s010 turbofan engine.
Although its diameter is only about 1.5 meters, its maximum length has reached seven or eight meters. At the same time, the thrust of this engine is also very huge.
The thrust of a single unit has reached the level of about 25 tons. Most importantly, this small bypass ratio turbofan engine has the ability to fly at supersonic speed.
#送888直播红包# Follow the vx. public account [Book Friends Base Camp], watch popular masterpieces, and draw 888 cash red envelopes!
The research and development purpose of this engine is for our company and the military's large supersonic aircraft.
However, unlike the previous turbofan engine with a large bypass ratio, we have already started design work on this engine as early as the beginning of the year. Up to now, the blueprint design of this engine is basically It has been completed. According to the progress, it is almost entering the stage of prototype manufacturing. If there is no accident, within this year, Tiangong Technology will be able to manufacture the prototype of this engine.
Of course, if all the design data and tests go well, we will see the completion of the development of this engine by this time next year. "
Just when Wang Bin finished speaking, all the people present, including Mr. Qin and Mr. Lin, applauded at once, and Mr. Qin said to Wang Bin very excitedly: "Okay! Very good!" Good! Mr. Wang, your Tiangong Technology is really amazing. You can develop such an engine with such excellent performance. I really hope to see the engine you mentioned by this time next year."
In fact, just as Wang Bin said, this engine is indeed transparent Tiangong Technology. As early as the beginning of the year, it had already begun to design the drawings, and it was also prepared for large supersonic aircraft.
It's just different from the supersonic aircraft that Mr. Qin and the others had in mind. In fact, this engine was specially developed for the Phoenix fighter jet that Wang Bin and his Tiangong Technology are currently designing.
Of course, since the Phoenix fighter is one of the top secrets of Tiangong Technology, Wang Bin has no plan to disclose it to Qin Lao and others now.
However, even if it is not disclosed to the authorities now, Wang Bin will still disclose it when the time is right. After all, the body of the Phoenix is so huge that it will definitely be discovered if it appears. Now there are so many satellites in the sky, such a big one. It is absolutely impossible for a fighter plane not to be discovered.
Then Wang Bin introduced several other fuel engines to them. Of course, there is still a certain gap between the ones he introduced before in terms of thrust and performance.
After introducing all the fuel-fueled engines, Wang Bin came to the electric engine area, and then said: "Mr. Qin and everyone, the engines here are very different from the ones I introduced to you before. , the previous engines, regardless of size, were all fuel-fueled engines.
The engines here are not fuel engines. These engines here are all electric engines built on high-performance superconducting batteries developed by our Tiangong Technology.
These engines are not only suitable for small civil helicopters with a power of no more than 500 kilowatts, but also heavy and super-heavy electric helicopter engines with a power of more than 2,000 kilowatts, or even 3,000 kilowatts.
In addition, there are other types of electric engines, such as the electric engine next to me, which is not an electric engine for helicopters, but an electric paddle fan engine, and its maximum output power exceeds five. Thousands of kilowatts, reaching 6,500 kilowatts.
Of course, this kind of power still has a certain gap compared with the power of many large turboprop engines.
However, this electric fan engine is not the largest electric fan engine in our exhibition hall. It can even be said that this electric fan engine is only a medium model in this exhibition hall. "
After speaking, Wang Bin walked to the engine next to this engine, and continued: "For example, the power of this engine is far greater than that of the previous one, reaching a maximum output power of 8,700 kilowatts."
You'll Also Like
-
I Secretly Got Married To a Super Boss
Chapter 3014 4 hours ago -
Doomsday: After Becoming Invincible, I Practice Dual Cultivation All Over The World
Chapter 275 9 hours ago -
I Was Really Forced To Have So Many Ex-Girlfriends
Chapter 362 9 hours ago -
Longevity: Using Martial Arts To Outlast Immortal Cultivators
Chapter 625 9 hours ago -
Ship girl transformation, the admiral goes to the military police to repent
Chapter 347 10 hours ago -
Surviving in the Mist: I can see the prompts
Chapter 278 10 hours ago -
Global Monster Era
Chapter 96 10 hours ago -
Naruto: I will destroy my clan immediately, but I am not Uchiha
Chapter 95 10 hours ago -
Pirates: To avenge the extermination of a family, kill all the Celestial Dragons!
Chapter 94 10 hours ago -
Choose the Saitama deck and be exposed by the Reborn!
Chapter 50 10 hours ago