Golden Fishery
One thousand five hundred and ninety. Tall buildings rise from the ground
Qin Shiou asked: "Don't you need to dig out a basement? I didn't see a basement?"
Shaq shook his head and explained: "No, you can't have a basement. This is not a villa, but a small three-story building. The foundation must be solid and solid, otherwise there are often strong winds by the sea, and problems will arise if the foundation is not stable!"
This is the first shortcoming of Canadian log houses. They are not protected against hurricanes. North America is a region where hurricanes often occur. The South Atlantic and South Pacific are more severe than the northern seas. Therefore, we often see TV reports of hurricanes in the United States, and then hurricanes or tornadoes. After crossing the border, houses were reduced to pieces of wood wherever they went. Le-Wen-
During Qin Shiou's first winter in Canada, he encountered a hurricane when he was fishing for lobsters in the Gulf of St. Lawrence. At that time, the coastal port cities were almost in ruins, and the Basque Port was severely damaged.
But Canada is okay. There are not many hurricanes and tornadoes, much less than the United States.
In addition, another disadvantage of this kind of wooden house is that it is not fireproof. Once it catches fire, there is no way to put out the fire. The people inside can run away as soon as they can.
Therefore, at the beginning, Qin Shiou bought fire-proof bazookas and fire-fighting bazookas in the name of fire-fighting in small towns. On their own.
However, it is good to live by the sea. The air is humid, so fires are not easy to break out. Even if there is a fire, the water source can be drawn in time to fight the fire.
Qin Shiou nodded to show his understanding, and said, "Come on, Shaq, I'll help with the work."
Shaq looked around, then gave him a nail gun, and asked him to imitate Zach to fix the wooden square on the concrete floor, and said: "Here is the construction drawing, and I will draw a line in front, you follow the line That's it."
After the wooden squares are fixed, the foundation wall is installed along the wooden squares. These squares act as a wedge to which the planks fit together.
The load-bearing walls on the first floor were built first, followed by other walls, after they were all built. They did not rush to open the second floor, but used electric drills to drill various holes in the wood, discussing where to make holes and where to open cracks, and then put on various wire covers for wiring in the future.
The bulls then began working on the marquee. This requires the use of sound insulation boards, first put a layer of sound insulation boards, then the high-strength composite floor on the second floor, and then lay a layer of sound insulation boards on top to finish.
The sea monster and Shaq lead people to work on the kitchen and bathroom on the first floor, which is the most complicated and important.
Qin Shiou followed to see,
The construction of the kitchen is relatively easy. The most important thing is the water pipes and lines. The upper water pipe and the lower water pipe system are more complicated. They can release cold water and hot water, and they also need to be able to discharge the sewage smoothly.
Sewage pipes are readily available. It was reserved when laying the foundation, as long as it is connected, Shaq poured a basin of water into it. The outlet of the pipe is by the sea, and it flows directly into the sea. Out."
The next step is to connect the wiring, and the fishermen are also good at it, because they usually handle the wiring at home, and there are traces to follow. You can master it after doing it a few times.
The complex is in the bathroom, where the sea monster is leading five fishermen to work. Like the kitchen, it needs water supply pipes, sewer pipes, hot water pipes, cold water pipes and various circuits. In addition, septic tanks have to be built.
Qin Shiou said: "What's so complicated about this, isn't it just as long as it leads to the seaside?"
The sea monster smiled bitterly and said, "Did you see that this place is still two kilometers away from the sea? What if the pipes get blocked in the future? The pipes of the Sanitation Bureau are easy to be blocked."
Qin Shiou nodded in agreement, and said, "That's right, I'm often constipated. The feces are hard and easy to block."
After hearing this, the fishermen laughed, and then they all made disgusting expressions, saying: "Don't disgust us, please go to work, leave this place to us."
Of course he was joking. There is a characteristic of Canadian houses. People process food in the kitchen, but the last things are poured into the health bureau for disposal. Therefore, the pipes of the sanitation bureau must not only be thick and wide, but also easy to maintain. It is indeed easy to block.
The sea monster called Weir, and after consulting experts, he chose a location for the fishermen to dig a pit for disposal, saying that he would build a septic tank there, and then let Weir install a set of biogas conversion facilities. Cook with biogas.
Qin Shiou asked you to ask me to work, so what do you ask me to do? The bull waved his hand and said, "Hey, you fill up the dehumidifier."
The biggest problem with houses by the sea is that they are too humid, which can easily cause wood to rot, so dehumidification must be done, usually with a dehumidifier. Install a dehumidifier in the house, and pour dehumidifier and desiccant into the middle of the wooden boards at the beginning of building the house. .
The construction of the septic tank requires the use of a large impact drill, because the foundation of the small building is very extensive, and the surface of more than 1,000 square meters is all poured with cement and reinforced concrete. The purpose is to create a good foundation—no way, The geology of the seaside is not good. If the foundation area is not enlarged, it will be fun in case of ground subsidence or landslide.
The power of the large-scale impact drill is very strong. It is specially used to drill things like granite and reinforced concrete. This thing is a bit like an electric drill that is magnified dozens of times. It is about one meter high and weighs forty kilograms. It is placed on the surface and energized. Afterwards, it roared and slammed into the ground.
With the flying of cement and concrete fragments, a septic tank of more than 80 square meters and more than ten meters deep was built. In this way, the purchased plastic septic tanks and septic pipes of different diameters were installed, and the installation was completed. After the sealing is done, it is considered half-finished.
In the future, Weir will bring people over to install some biogas pipelines and machines for the septic tank, and it will be the end of the process after all are installed.
After the septic tank was dug, the first day's work was over. Qin Shiou didn't do heavy work, but he wasn't tired. The fishermen were sweating profusely, and they really worked hard for a raise.
The work in the next few days was a copy of the work on the first day. With the delivery of large floor-to-ceiling windows and doors and windows, the first floor quickly became decent.
The four walls of the small building are four large floor-to-ceiling windows, and the glass is naturally specially reinforced. These four floor-to-ceiling windows alone cost Qin Shiou 180,000 Canadian dollars, which is the same as the total price of the skeleton used to build the small building!
But it’s worth the money. With these four floor-to-ceiling windows, the first floor can almost be used as a sightseeing room in the future. In addition, the sunlight can prevent moisture.
The first floor was completed, followed by the second floor, then the third floor, and finally a small attic was added on the top of the third floor. Shaq said it can be used as a utility room, which is very user-friendly.
In this way, the basic skeleton of the small building has been formed. No wonder the fishermen are full of confidence. The main materials used during this period are processed wood and composite panels. The doors, windows, tiles, and floors are ready-made, which can be assembled on the assembly line. (To be continued.)
...
You'll Also Like
-
The Real Daughter Tells Fortunes Live
Chapter 95 20 hours ago -
What the hell is making games in the Ninja World?
Chapter 228 21 hours ago -
I signed in at the Reincarnation Paradise
Chapter 248 1 days ago -
A teacher with zero training in the Hanging Class
Chapter 615 1 days ago -
I am the master of depressive comics
Chapter 240 1 days ago -
My Doomsday Hotel
Chapter 164 1 days ago -
Because I'm a coward, I maxed out my san value
Chapter 681 1 days ago -
It is said that I convince people with reason
Chapter 361 1 days ago -
Elf: My Healing Farm
Chapter 135 2 days ago -
Zongman: Start with Sakurasou and pick up a female high school student
Chapter 352 2 days ago