I Found A Planet

Chapter 45 Power problem, solve it!

Starting from October 20th.

In the next half month.

Over there at the Dakeng camp.

Chen Jin fell into a very busy state.

Use the Universal Capsule Factory to print wind turbine parts and make generators!

Of course, Chen Jin is not busy alone, there are hundreds of powerful robots helping him from the sidelines, acting as free coolies.

So there are not many places for him to exert his strength.

Even so, he was exhausted enough, requiring him to solve a lot of troubles and conduct command and dispatch.

The first is the energy supply problem of the capsule factory.

The capsule factory is also a factory, and it also has the characteristics of "large power consumption".

Its normal standby power consumption is 20KW, regular use power is 80KW, and maximum use power is 300kw!

Chen Jin cut off the power supply of the supercomputer (the data has been exported in advance), and connected all the 30KW household circuits in his room to the capsule factory.

It is just to let the capsule factory start up smoothly and be in a state of preparation.

To make it work properly, there is at least a 60KW power gap.

How to fill this gap?

High energy battery.

A large high-energy battery weighing 10 kg can provide a maximum output power of 3KW.

Connecting twenty large high-energy batteries in parallel is enough to provide the power required for the operation of the capsule factory.

However, under the high-power working condition of 3KW, the large high-energy battery can only work for 12 hours, and it will emit a lot of heat, which will affect the safety of the battery.

Only the 'Expedition One' with 100 large high-energy batteries in the battery compartment can be driven over as an energy supply vehicle to provide sufficient power.

Even so, the power consumption of the capsule factory is still beyond imagination. Even if all the batteries are fully charged, the "Expedition One" can only keep the capsule factory running for about 20 hours.

It means that a batch of hundreds of large high-energy batteries needs to be replaced almost every day.

And a large high-energy battery weighs ten kilograms.

multiply by 100...

On this side of the earth, Chen Jinde goes to the charging factory in Baoshan Industrial Zone every day to carry a one-ton high-energy battery into the car.

Then move them piece by piece to the 302 where they live.

There is no elevator in the stair room, so you can only go up to the third floor!

Moving up and down should be repeated every day.

Hands numb when carrying, legs cramping when walking, but I have to persevere!

Even so, on the fifth day, the charging speed of the batteries at the charging factory was gradually unable to keep up with the power consumption of the capsule factory, and the problem of power shortage began to appear.

Fortunately, the manufacturing workload of the ten wind turbines is not heavy. On the sixth day, all the parts that need to be printed have been printed by the capsule factory.

Then there is the assembly of the modules, assembling the three major components of the generator blades, generator host, and support columns.

Then there is the choice of where the wind turbine will be placed.

Since it is a wind turbine, there is no doubt that it must be installed in a place with a strong wind, so that the power generation effect will be better.

Only when the wind power reaches the standard can the generating power of the wind turbine reach the rated 30KW.

So on the issue of site selection, Chen Jin bought a wind speed tester from the other side of the earth. It was hoisted by a DJI Phantom 4Pro drone and lifted 20 meters into the air to measure the wind speed.

Finally, two more suitable locations were selected.

Location 1 is located on a rocky mountain 30 kilometers away from the northwest, with an altitude of more than 300 meters, not far from the battlefield. It is calculated that the normal wind speed is as high as 25m/s, and the maximum instantaneous wind speed is above 35m/s, which can completely generate wind power. machine reaches full power generation.

The disadvantage is the long distance and inconvenient transportation.

Site 2 is located on an unnamed earth mountain five kilometers to the east. This earth mountain is not high in altitude and relatively flat. Because it belongs to the protruding part of the plain landform, the average wind speed on the mountain reaches 15m/s, and the intermittently large wind speed can reach 25m /s above.

The advantages are short distance and convenient transportation.

The disadvantage is that the power generation is low and may not reach full load.

After some weighing.

The wind turbine installation site was selected, and Chen Jinxuan placed it on an unnamed earth mountain five kilometers to the east.

The reason is for the safety of the generator.

The Shishanling in the northwest usually has a relatively high wind speed. Once the weather changes suddenly, the instantaneous wind force can even reach more than 50m/s. This wind speed exceeds the structural capacity of the wind turbine, and the supporting column may be broken by the strong wind.

Device security is not high.

Recently, the planet Haierfa has entered November, the weather in the northern hemisphere has turned cooler, and the north wind is getting stronger and stronger. Therefore, wind power generation equipment is not suitable for installation in places with strong winds.

On the unnamed earth mountain five kilometers to the east, the wind is slightly weaker, but the safety of the equipment is relatively high.

Moreover, the distance is very short, and the earth hill is easier to excavate and install than the stone hill.

The installation location is determined.

Chen Jin led the robots to set off, and let the robots carry the various parts of the wind turbine, and set off in a mighty manner towards the unnamed earth mountain in the east.

"At this location, first dig a large hole in the ground with a diameter of three meters and a depth of five meters."

"Insert some high-strength steel bars and throw some broken stones into the steel cage columns."

"Bring over the scrap steel that was dismantled from the Tris City Football Stadium."

"Repair the robot, start the laser, heat the scrap steel, melt the molten steel into it for me, and fill in the rest except for the installation hole of the wind turbine!"

good!

On the side of Hellfa planet, there is no ready-made cement available.

But there is enough scrap steel.

Chen Jin asked the robot to pull thousands of tons of scrap steel over, melt it into molten steel at high temperature, fill it into the foundation pit, and use it as the installation base for wind turbines.

One hundred tons of molten steel was melted into each base to form a steel-liquid-reinforced gravel structure, which is definitely much stronger than a reinforced concrete structure!

In addition, the cylindrical mounting hole reserved for the installation base can just fit with the support column cylinder of the wind turbine. After opening the movable/locking buckle, it can rotate 360 ​​degrees, so that it faces east when there is east wind, and faces north when there is north wind. The wind is directed to the north, generating electricity at all times.

And ten robots can complete daily maintenance.

The installation of the entire wind turbine took a total of three days.

In the end, it took a few more days to install the transformers, voltage stabilizers, power collectors, and power storage equipment, and pull out a ten-kilometer transmission cable.

After some debugging.

On the fifteenth day.

The wind turbine group was formally connected to the grid for power generation.

The supercomputer was restarted, and Alice, the artificial intelligence in charge of monitoring, said:

"Master, the average power generation capacity of the current power generation facilities is 260KW, and the maximum power generation power is 280KW. This power is enough for a small farm."

"Well, my camp finally has electricity!"

Chen Jin nodded and heaved a sigh of relief.

The energy shortage problem in the Big Pit camp was temporarily solved, and it got rid of the dependence on the electricity on the other side of the earth.

But it is still too early to say that the energy problem has been completely solved.

Because there are too many big electricity users!

The modified car Adventure 1, the supercomputer, the capsule factory... these three things can use up all the 260KW power generation.

There is also a Blue Angel electric car, more than 100 robots, several electric motorcycles, and several tools such as lasers... The electricity consumption of these small electricity consumers is also very considerable.

Chen Jin estimates that only by increasing the number of wind turbines to 40, with a total generating power of more than 1,000KW, can the power needs of the Dakeng camp be adequately met.

However, the raw materials for printing are not enough at present. To increase the number of wind turbines, we must wait for the collected materials to be sufficient before feeding them into production.

"It's better to expand the power facilities after a while. I've been exhausted for half a month, so I need to take a good rest and buffer myself!"

"The 260KW generating power is barely enough for the time being. The household wires pulled over from the earth can be unplugged; the charging factory on the Baoshan Industrial Zone can also end its mission."

"Undoubtedly, getting rid of the dependence on the earth's electricity, the risk of secret exposure is greatly reduced, and a relatively huge hidden danger has been eradicated."

"Now, I finally let go of part of my heart."

Tomorrow, I will go to the city again to look at the house. The next chapter will be updated later, or it will become the third watch tomorrow. I have a son, and a house is a must. Of course, the pressure is great, but there is no Pressure, where is the motivation...

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like