I, who plundered the heavens, had a hundred thousand dead men
Chapter 31 Centennial Project
…
Two days later in the morning, Li Yang welcomed a professional construction team.
In order to make use of his dead soldiers, Li Yang also took the time to go for a tour of the town yesterday, and then summoned five young dead soldiers to drive them back to Tagou Village.
These dead men had all had experience working on construction sites when they were in Hong Kong Island, so Li Yang summoned them now and they could quickly adapt to various tasks on the construction site.
Of course, if it involves some technical work, these dead soldiers are still a little behind, but doing some physical work and doing odd jobs is no problem at all.
Since the drawings of his house have not been designed yet, the temporary work is only to pour nearly 300 meters of road and fill several acres of fish ponds with cement.
In two days, the fish pond was completely dug with the cooperation of two excavators.
All that's left is to build a dam with steel bars and concrete around the fish pond.
After all, the deepest part of the fish pond dug by Li Yang is more than 3.5 meters, and even next to the dam it is more than 2 meters.
Such a deep fish pond will definitely not work if we don’t build a good dam.
Therefore, Li Yang simply moved closer to the Centennial Project.
Not only must 20 centimeters of concrete be laid around the entire fish pond, but a beam must be added every few meters. At the same time, a layer of steel bars must be laid around the entire fish pond.
Preliminary calculations show that the cost of this fish pond alone will exceed the cost of building a small western-style house in a rural area.
"Master Wang, the steel bars, building formwork, timber and other materials I bought were all put in place yesterday. How many days will it take you to complete the steel bars and formwork? Can 2 days be enough?"
Since Li Yang had planned to let his dead men be the main force in building his house from the beginning, Li Yang bought new building materials, and the materials were much more than originally planned.
of.
At the same time, Li Yang also purchased 3 brand new concrete mixers and a lot of other construction tools.
Some of these items have already been delivered, while others are still in transit.
Because many tools were ordered by Li Yang through the Internet, and they were all transported through logistics anyway.
Hearing Li Yang's inquiry, the 50-year-old master felt helpless.
"Boss Li, I know you are in a hurry, but with such a large amount of work, you can't do it in two days. It will take at least a week. If it rains, the time will have to be postponed."
"It doesn't matter if it rains. As long as it's not pouring concrete and it's just a little rain, I'll just buy some large clinker films. Anyway, I'll have to get your steel bars and formwork ready for me as soon as possible. As you know, I'm pressed for time.
I still have a lot of work to do in the future.”
In order to complete the initial construction work faster, Li Yang outsourced all the bundling of steel bars and formwork for the fish pond dam to the other party based on the weight and area of the steel bars.
Because only in this way, these people will work more quickly, and will not delay time like they want to do some work.
As for the five dead men Li Yang summoned yesterday, he started pouring concrete for the road today with several nearby masons and idle labor force Li Yang invited.
The busy time passed, and five days later came in the blink of an eye. In the previous two days, the several hundred meters of road leading from the village's main road to Li Yang's old house had been completely paved.
Next, we need to wait for a maintenance period of about ten days before the truck can communicate. Therefore, subsequent construction can only be carried out after the road can pass vehicles.
However, Li Yang and the temporary workers he invited will not be idle in the next few days. In the next few days, they will also pour the dam of the fish pond.
The materials for pouring the fish pond dam have been piled around the fish pond dam before. After the steel bars and formwork are laid completely, they only need to be poured in sections.
In the past few days, Li Yang himself has not been idle. In addition to patrolling everywhere every day, he communicates with the designer who designed the house for him through his prestige.
At the same time, Li Yang also learned a lot about construction precautions during this communication, including how to understand construction drawings, etc.
Because when the house is built next, Li Yang himself has to play the role of a construction worker.
After all, the house he saw looked like a courtyard house on the surface, but it actually had a large basement inside.
And this basement will continue to be expanded in the future.
Therefore, during the early construction of the house foundation, Li Yang had to make a series of preparations for the subsequent construction.
The specific construction work was Li Yang’s own secret, so all the specific work, including the construction work, had to be done by Li Yang’s dead men.
Since none of Li Yang's current dead soldiers have the ability to do construction, he has to rely on himself for the construction work for the time being.
You'll Also Like
-
Destroyer from otherworldly
Chapter 187 10 hours ago -
The second young master of the Uchiha family
Chapter 258 10 hours ago -
Douluo's Strongest Son-in-Law
Chapter 1392 10 hours ago -
Three Kingdoms: I Guan Suoqian Turns the Troubled Times
Chapter 49 10 hours ago -
Pokemon Dawn
Chapter 372 10 hours ago -
Douluo Jade Legend
Chapter 71 10 hours ago -
Douluo: Starting from Fooling the Blue Silver Emperor
Chapter 291 10 hours ago -
God of Douluo Continent punishes Qinglong
Chapter 69 10 hours ago -
Douluo Emperor Sword Douluo
Chapter 209 10 hours ago -
Douluo: Miss Tang Sect, she blows up the audience
Chapter 545 10 hours ago