reborn industrial empire

Chapter 428 Engine Machining Center

Volume 1] Chapter 428 Engine Machining Center

----------

Chapter 428 Engine Machining Center

Outbreak, please support!

"I saw it and was very satisfied. Mysterkin, those are all good things. Some of them are not easy for us to get from the Americans. How did you get them back?"

When Helis heard this, his face was filled with ecstasy, but Jin Xiaoqiang could only pretend to be silent.txt e-book download**

After finally convincing Herlis, and then listening to the old guy thinking about the future work of this biological laboratory, Jin Xiaoqiang gave Herlis a new task.

That is, he should not stay here all day, but should go back to participate in personnel training, and formulate more stringent production and experimental procedures for future research and development work.

Herris did not refuse. Currently, the construction operation of this construction site is on track. Professionals are taking care of many places. He does not need to point fingers here often. He only needs to come over regularly from time to time to check.

So he readily agreed to the new task assigned by Jin Xiaoqiang.

After saying goodbye to the construction site, Jin Xiaoqiang went back to the company directly. He had another arrangement today, which was to inspect the company's newly built engine processing factory.

In the past, because many of the machinery and tools for processing engines were secretly imported from Japan, they had not dared to publicize their engine processing base to the outside world.

It was not until the company was officially established that this base was constructed in the factory area behind the company's R&D center. In front of it is the automobile body processing area, and on the right is the special steel smelting center.

This work area has always been the company's top priority. You must know that Huayang Power's current engine technology is much ahead of other large companies in the world, so the construction here has also been the focus of Jin Xiaoqiang's attention.

The previous processing center was located in several old factories of the machinery factory. In the early days of building the warehouse, the place was only renovated, water and electricity were connected, and the roads were smoothed again.

In the early days of building the factory, it was just enough. However, with the global sales of Huayang Power's products and the increasing number of orders from all over the world, the original few factories were obviously not enough.

.

As early as the construction of the factory, Jin Xiaoqiang had already started arranging manpower, measuring the area, and designing drawings to prepare for expansion. After the company officially announced its establishment, the project began construction.

However, in order not to interfere with the current production, the progress of the project has been very slow. When the company was founded, there were no new cars on the market, and when the new cars were first launched, the order volume was not large, so it was still

Just enough to handle it.

But since Huayang Power began to explode in the market last year, this situation was no longer enough to cope with the situation. Jin Xiaoqiang gritted his teeth and asked the construction company to speed up the progress. Just before he went to Paris to attend the auto show this time, the project here had just been completed.

.

After more than a month of simple decoration and another month of production line debugging, just a few days ago, their engine production department officially moved.

This has become the core machining area of ​​Huayang Power, because every component produced here will affect the quality of Huayang Power's cars in the future.

The person who accompanied Jin Xiaoqiang to visit the new engine factory today was Zeng Jianxin. After formulating the expansion plan for the new engine machining center, Jin Xiaoqiang became the boss. Now that the engine machining center is completed, but for

Jin Xiaoqiang is not as familiar as Zeng Jianxin here.

"Look, Mr. Jin, here is the factory diagram of our engine processing center. This new factory covers an area of ​​150 hectares, of which the factory building covers an area of ​​50 hectares. In this production and processing center, we have 4,000 workers, including

The 2,000 people were experienced technicians recruited from Nanyang and all over the country when the company was founded.

Workers are generally experienced workers who have been engaged in engine manufacturing and processing before. After receiving our training, they have become qualified workers in our machining center and have worked in our company for more than two years.

experience, and there are another thousand young skilled workers we recruited last year. These workers have the lowest

They all have high school or college education. After more than a year of professional training, they are now qualified as professional workers. They are also the skilled workers we will focus on cultivating in the future. There are also another thousand people who have been trained since the establishment of the company.

, senior talents have been recruited one after another. About 300 of these people are college students or

Among them are masters and doctoral students whose previous major was mechanical processing. There are also 200 college students who previously studied internal combustion engine design. Another 300 are masters of machining. They each have their own unique skills in machining.

There are 200 people who are quality inspection engineers. These people are the ones our company will focus on training in the future."

In front of the factory display board in front of the engine machining center, Zeng Jianxin pointed to the drawings on the board while introducing Jin Xiaoqiang.

Jin Xiaoqiang felt very happy when he heard Zeng Jianxin's explanation. It seemed that the core part of his company was finally on track.

As an engineer in the automobile industry in his previous life, Jin Xiaoqiang had seen several engine machining centers of domestic independent companies. To be honest, many manufacturers' machining centers have unreasonable designs, irregular layouts, and imperfect processes.

place.

Of course, this is related to our lack of experience, so after setting up his own engine machining center in this life, Jin Xiaoqiang will of course build his own machining center according to the highest standard of his memory.

In fact, their current engine machining center is modeled on Volkswagen's engine machining center on the outskirts of Stuttgart.

In his previous life, Jin Xiaoqiang had the good fortune to see the layout of Volkswagen's engine machining center from a magazine brought back from abroad by a young man who was a car enthusiast.

And what's more coincidental is that when the wealthy young man traveled to Germany, he visited the processing center and took a lot of photos. When he was communicating with the rich young man, he just read the magazine,

I took photos with Mr. Kuo while chatting nonsense.

Although he had never been there himself, he designed such an engine machining center after listening to the young man's explanation and the combination of the company's production situation that he had experienced before.

Volkswagen's engine processing center covers an area of ​​about 130 hectares, of which the factory area is about 40 hectares. There are more than 3,000 workers in the factory and 200 intern workers. It mainly produces 1.6 engines for golf and polo.

The factory built in 1960 has been renovated several times and has grown to a large scale. The daily output can generally reach 4,000 units, and the annual output can exceed one million units. Of course, this is without full production.

If full production and processing were to be carried out, the annual output would not be a problem even if it exceeds two million units.

Jin Xiaoqiang's work area is completely modeled on Volkswagen's machining center, except that it is larger in scale, has a higher degree of automation, and the production procedures are more complex.

Because Huayang Power is not as powerful as Volkswagen now, but it can expand several factories anytime and anywhere to produce specialized engines for certain models.

Therefore, all brands of their company's engines can currently only be produced in this factory area.

The workers work three shifts, eight hours a day, using a shift system, and the types of engines produced in each shift are completely different.

For example, in this shift from 6:00 in the morning to 2:00 in the afternoon, what is produced is the 1.6 ordinary model engine with or without DVVT system that is equipped with the best Octavia currently sold by Huayang Power.

The shift from 2:00 pm to 10:00 pm produces Huayang Power's most famous ecoboost engine.

The shift that starts at 10:00 pm and ends at 2:00 am is responsible for producing some special types of engines, such as diesel engines, or the recently popular engines with Chuangchi Blue Sky technology, etc.

In this way, the design of the production process of this machining center will be relatively high, and the automated production procedures of the automatic robots in the machining center will also be adjusted at any time.

Of course, these have already been arranged by Zeng Jianxin and others, and there is no need for him, Jin Xiaoqiang, to take special care.

The head office of Huayang Dynamics currently has more than 15,000 employees, reaching about 18,000. There are 15,000 workers on the front line participating in production, and more than 2,000 people in marketing.

and public relations and logistics teams, and more than a thousand other senior talents responsible for production management and administrative management.

Among them, the hundreds of talents who are specialized in production management are highly valued by Jin Xiaoqiang. These talents who understand the technology and understand the management will be valuable human resources for the development of the company in the future.

resource.

It is precisely because of them that we can perfect Huayang Power's production plan.

The most important part of engine production is cylinder support and assembly. In this machining center, various cylinder castings will receive materials from the smelting center and then transported to the casting department on the far right for rough casting.

, or processed by other methods, and then transported to the first quality supervision station for quality inspection.

After all are unqualified, they will be placed on the bracket, transported to the second department for cleaning, and then sent to the honing machine for honing...

www.ptwxz.com

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like