Skynet Architect

Chapter 47 The Assistant of the Agricultural Professor, Si Fan

The spring breeze of reform blows into the door, and a very beautiful pure green train departs from the huge freight train station, goes directly to the opposite wheat field through the cross-river bridge, and in the distance is a sea estuary, heading directly to the distance, to the construction site .

The train circled around and arrived near the port.

The train was constantly moving forward, the wind whistling, and the shaking of the rails was very obvious.

There are still some differences from domestic trains. Although the track of this train has been used for a long time, there is a gap in the quality of the track. After passing the bridge, it is obvious that the train track is not so stable. Most of the time when driving There will be a shaking feeling.

Si Fan sitting on the train is like riding a bumpy tractor in the countryside when he was a child, enjoying the most torture to his butt, the whole journey can be described as terribly tortured.

Just reaching the site near this port is already fatal.

"Squeak!" The train gradually decelerated, and slowly stopped moving forward. The speed of the car was not very fast. At this time, it slowly slowed down, and then stopped moving forward.

The people in the car are very calm, they all know where they are now.

This is the area that has just arrived in the Kingdom of Jin. Near the newly named independent port of the East Asia United Port, Si Fan saw a huge construction army.

The construction army is still divided into layers. The two construction teams are clearly separated. The countless mechanical areas in front are the construction teams of the Skynet Group. They are responsible for building the central area of ​​the port.

This is the most technical content and is also the core of the port. In this area, all the work revolves around building the entire basic area of ​​the port.

Ensure geological stability, stabilize the soil on the ground, and even tamp the ground hard.

This requires a lot of machinery. The purpose of compacting the ground is for future super-large projects. Some world-class machinery and equipment will be used here.

In the other direction, there is another group of people. They are more embarrassed. These are the people sent by Jin Guo. The excavators are like little ants, working hard.

It's just that their jobs are more awkward.

Because they are cleaning the river, the water holding capacity of the cargo ships traveling in the river of this port will increase, and the silt below will be cleaned up to provide a smooth river.

After all, if a port is built, then it can’t just be an ocean port. In fact, the carrying capacity of this river is quite domineering. As long as the dredging is completed, this is a very long transportation route, ensuring that the entire upstream area will be able to travel downstream. Next, ship bulk cargo directly to the following international ports.

And the international port below connects the whole world, which will greatly reduce the transportation costs of upstream cities.

Si Fan is well aware of this, so when the port was built, it was clearly marked in the requirements. Where the port needs to be spent, Huaxia spends more money, and when the population needs coolies, the Kingdom of Jin contributes more.

Only in this way can the two sides cooperate.

Of course, the little fat man smiled and agreed, which is a good condition.

The car stopped, there was no need to cheat here, they were all their own people, only the people who were working in that river were from the Kingdom of Jin, but they couldn't get close, this place was a restricted area for them.

When the train stopped, everyone breathed a sigh of relief. Si Fan poured himself two sips of mineral water, and then slowly got out of the car, and was in the mood to look at the train.

Under this careful observation, he couldn't help but smile.

Jin Guo really carefully decorated this train, grasping every detail very well. The interior of the train is a very simple pastoral style. It is estimated that a very professional designer will design it and then arrange it. Every detail makes people have to admire their exquisite craftsmanship.

Of course, I have to admire their work efficiency. The entire train was decorated and completed within three days.

That is to say, they were not decorated by a few people, but by a group of people. Countless people completed the decoration in an area of ​​almost one square meter per person within three days.

More importantly, it is estimated that several people worked together to complete some of the details, and then installed them.

Such labor costs are very scary. But Jin Guo didn't think he was a problem at all. This miracle was accomplished in such a short period of time.

Walking on the shattered blanket, the softness made Si Fan feel embarrassed to step on it hard, but Si Fan, who was shaking all the way, got out of the car quickly.

When he got off the ribbed car, he finally took a breath, as if he had been on a boat for a long time, shaking constantly, now it finally stopped, and he himself had a feeling that the world was shaking.

Just sat for less than half an hour.

All he had left was pain. The train painting behind him was pretty good now, but Si Fan was not in the mood to look at the pattern of Dalian's green harvest scene, nor was he in the mood to look at the promotional slogans.

This car is specially designed for super agricultural experts.

Si Fan didn't bother to complain, and went directly into the port.

The port under construction is a very huge construction site, and Si Fan is very familiar with it. On the ground of the port, countless huge road rollers are constantly crushing the ground.

On this ground there are a large number of pebbles, which are pressed into the ground below by rollers.

There are rows of trenches in the middle. These trenches are the underground pipelines of the port in the future. They are now left alone. They are used when the pipelines are buried later. The current buried pipelines are not as rough as before. Instead of direct landfill, it is necessary to use a block-type integrated submerged module, and then just insert it directly according to this slot. When it is necessary to check or adjust the pipeline used, directly lift the module with the supporting machinery.

Then go down and check the pipeline.

It will be much easier to maintain in the future. The most important thing is that the pipeline will be maintained almost every few years here. I don’t know what equipment will be there in the future.

After looking at the current work progress, he has determined that the construction here can be carried out quickly, and it is guaranteed that the port will start to use within one and a half years.

What an exaggerated speed this is, only a lunatic like Si Fan can handle it, and only he can do it.

Strolling into the port, slowly deepening, looking at the ground being compacted, the river channel being widened, and the coastline of the port in the distance.

That berth being dug.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like