Steel Tycoon Reborn
Chapter 848: Huaidian East Transmission
Knowing that Song Qiaosheng had already rushed to see the old man by car at this time, and asked the old man to mediate, Xie Haicheng, Ye Xuanfeng and others, their eyes lit up, as if they had caught the last straw, they seemed to see some hope.
However, Ye Xuanfeng's eyes soon darkened again, and he sat silently by the side.
Xie Zhi saw Ye Xuanfeng's subtle reaction in her eyes, and she didn't find it strange in her heart: Even if Hong Qi's father asked the old man to come out, it would be impossible to ask Shen Huai to make concessions without paying any price; moreover, Huaineng fell into In the current situation, although many things have the approval or instigation of Hongqi's father, He, Dai and others, there must be someone to take responsibility for this. Besides Ye Xuanfeng, who else can it be?
However, Xie Zhi even doubted whether the old man would come out to persuade him to make peace. He also suspected that even if the old man couldn't bear to see Huaineng being split up in two or three years and came out to persuade him to make peace, the harsh conditions proposed by Shen Huai might still be accepted here. No.
Xie Zhi was thinking wildly in her heart. At this time, there was the sound of a car stopping outside the yard.
Xie Zhi didn't know who would come here at this time. The nanny who was sitting in the side hall came out to take a look, then turned to the living room and said, "Secretary Song has arrived."
Hearing that Hongqi was driving, Xie Zhi stood up and followed the nanny out to open the courtyard, but she felt strange: if her father called Hongqi after she accompanied Ye Xuanfeng to see Zhong Limin, secretary of the provincial party committee After calling about this matter, Hongqi decided to rush to Xucheng temporarily. Why did it take more than three hours to come here? It has only been an hour and a half, why did Hongqi arrive so quickly?
However, at this juncture, Xie Zhi would not understand what she was thinking about. Perhaps Hong Qi knew that her aunt Song Wenhui had arrived in Xucheng and was already on the road. She helped the nanny to open the wrought iron courtyard door and asked Hongqi's driver to drive the car into the courtyard.
Song Hongqi knew the attitude of Zhong Limin, Secretary of the Huaihai Provincial Party Committee, on the phone. When he got out of the car, he was more concerned about the specific details of the ultra-high voltage project. When he entered the house, he asked about the relevant situation.
Xie Haicheng, Liu Jianguo, Su Kaiwen, and even Zheng Yiwu went to the doctor just now. They forgot that the investment and construction of domestic projects in the fields of power grid lines, thermal power, and coal, as well as national and local policies, are very different.
For such a big project, even if Shen Huai has tens of billions of cash in his hands, it doesn't mean that he can do it if he wants to.
Just like Xinpu Refining and Chemical, which basically had the conditions for starting at the end of the previous year, but it was unable to establish the project or pass the approval.
Listening to Hongqi coming over and mentioning this issue, Xie Haicheng, Su Kaiwen, Liu Jianguo and the others all looked at Ye Xuanfeng and Xie Zhi: Now we can't put all the last chips on the old man. There are loopholes in this area, and there is a serious conflict with the current domestic economic policy. Even if the Huaihai Provincial Party Committee and the Provincial Government strongly support it, they are not without means of delay.
When Xie Zhi participated in the discussion with the provincial party committee, his mind was very confused, but he still heard the general details. Knowing that Ye Xuanfeng was under enough pressure tonight, he answered this question for him: "The whole ultra-high pressure project is divided into three parts. The implementation of three links is to introduce the ultra-high voltage line of the Jiangdong main power grid from Huaixi, and Jiangdong Electric Power Group is responsible for the investment and construction; Meisteel and relevant units in Huaihai Province are responsible for the investment and construction of the Zhujiang Hydropower Station and Huaixi Kengkou Thermal Power; Huai Coal Group is responsible for the investment and construction of supporting coal mines.”
The equity structure of Meishan Iron and Steel Group is complex, and there are policy obstacles to directly invest in the construction of ultra-high voltage lines. Jiangdong Province will soon implement the pilot work of separation of plant and network. Jiangdong Electric Power Group will be solely responsible for the investment and construction of ultra-high voltage lines. Meigang or Yexin Bank can provide Jiangdong Electric Power Group with corresponding construction loans by purchasing corporate bonds.
As for the construction of thermal power clusters and large-scale supporting coal mines, although there are certain restrictions in policy, they are not so strict. In terms of equity structure, the overall proportion of state-owned shares in Meishan Iron and Steel is not high, but on different levels of platforms, the distribution is different. Shen Huai should have a way to avoid policy restrictions and directly control the thermal power cluster and large-scale supporting coal mines to be built in Huaixi.
After Song Hongqi went to the local area, he focused on studying the intricate relationship between local assets, but he also knew that Shen Huai's research in this area was not comparable to him. He didn't want to catch Shen Huai's loopholes from the big frame, and motioned Xie Zhi to continue.
"...The whole project will also be implemented in three stages. First, Meishan Iron and Steel will join hands with the Provincial State-owned Investment Corporation, Huaimei Group, and Huaixi Municipal Axe to invest in the establishment of Dongjiang Power Group, which will become an investment in the construction of thermal power clusters and large-scale supporting coal mines. , The main body participating in the ultra-high voltage project. At the same time, the Provincial Power Supply Corporation took out the assets of the Zhujiang Hydropower Station, which had been constructed for six years, and the second-phase cofferdam was washed away in this flood disaster and suffered heavy losses, and placed them in A joint venture company established by the Provincial Power Supply Corporation and Dongjiang Electric Power Group, Dongjiang Electric Power Group injected 600 million funds into this joint venture company in exchange for 20% of the shares. The state-owned holding company of the joint venture company remains unchanged, but has the 600 million yuan capital The Zhujiang Hydropower Station, which used to be the largest industrial project in Huaihai Province, can continue the follow-up construction. At the same time, Huaimei Group took out the assets of Qingfeng Coal Mine, which was the most affected by the disaster, and put it into a joint venture company, and Dongjiang Power Group invested four The expansion of production capacity by billion holdings has ensured that the coal output of Qingfeng Coal Mine has increased to 6 million tons. Dongjiang Power Group wholly acquired the Huaixi Power Plant, and at the same time started the construction of the second-phase power plant project with an installed capacity of 600,000 kilowatts. The above is the first step of the whole plan. In the first stage, the approval power of all projects is at the provincial and municipal level, and there is no need to pass the approval of the ministries and commissions, and it will be fully launched as soon as next month.
Huaihai's post-disaster treatment, reconstruction and economic boost require immediate infusion of large sums of money.
As long as the construction of the Zhujiang Hydropower Station does not stop, the Qingfeng Coal Mine under Huaimei can immediately start a large-scale transformation and expansion, and the second phase of the Huaixi Power Plant with an installed capacity of up to 600,000 kilowatts can quickly start construction. Huaixi City and surrounding districts and counties The economic cycle will not be brought to a standstill.
This two billion yuan is a stimulant for the economic development of the western region of Huaihai Province. It also involves the two large provincial state-owned assets of the Zhujiang Hydropower Station and the Qingfeng Coal Mine, which will not suffer heavy losses due to the disaster. The province does not need to invest a lot of relief funds in these two areas, and the financial disaster relief pressure can be relieved a little.
Whatever Shen Huai does, he likes to cast bait on flavors. With the first phase of the plan alone, the province cannot refuse.
"During the implementation of the first phase, is the official launch of the ultra-high voltage project and the start of the second phase of the entire plan. How long the process takes will ultimately depend on the speed of national approval. Once the national project is approved and the environmental protection approval is issued, Jiangdong Electric Power The group will start the construction of the ultra-high voltage trunk line between Huaixi and Jiangning, and Donghua Power Group will invest 2 billion at the same time to start the construction of two sets of three-phase power plants with a total installed capacity of 1.2 million kilowatts and the Huaixi power plant. The renovation project of the old factory has ensured the completion of the construction of ultra-high voltage lines. Including Zhujiang Hydropower, the power transmission capacity from Huaixi to Jiangdong Province has reached 3 million kilowatts of installed capacity; the capacity of large-scale supporting coal mines has been expanded to 15 million tons. The head office started the pilot work of separation of factory and network..."
When Xie Zhi said this, Song Hongqi, Xie Haicheng, Su Kaiwen and others all took a deep breath: in the second stage of the implementation of the plan, Shen Huai began to target Huaineng, not only Huaineng in terms of the overall scale may be affected by Dongjiang Power. Closer; the separation of plants and networks started in the province will directly weaken Huaineng's control over the Huaihai Bay power market.
"In the third stage, after the completion of the pilot work of plant and grid separation, the Provincial Power Supply Corporation will gradually start the upgrading and transformation of the province's main power grid; Jiangdong Province will start the construction of the second phase of ultra-high voltage lines, and Dongjiang Power will start the fourth phase of the power plant construction. The power transmission capacity of Jiangdong Province will reach 6 million kilowatts, and the power supply capacity to the main power grid in the province will reach 2 million kilowatts. If it goes well, the whole plan will be implemented within five years. …”
Hearing the word "Huaidian Dongfang", Song Bingsheng, who had been sitting on the sofa without saying a word, snorted heavily.
Xie Haicheng also sighed, the concept of "Huaidian power transmission to the east" officially surfaced, and if the dominance falls into the hands of others, the gold content of "Huaihe coal to the east" will drop sharply, and the foundation of Huaineng's foothold will be loosened. half.
After the separation and upgrade of the Huaihai Province power grid, Dongjiang Power will directly supply power to the province, forming direct competition with Huaineng. Huaineng Group has no “irreplaceable” status in the areas along the Zhujiang River and Huaihai.
Although the large-scale consolidation of central enterprises has not yet officially started, some pilot work in the early stage can also show the main ideas of Premier Wang Yuan. Central SOEs that cannot gain a core position in the regional economy or the national lifeline industry and are not competitive are very likely to be split and merged - this is the Achilles heel of the Huaineng Group, which Shen Huai reminded here as early as last year.
Xie Zhi looked at everyone's reaction, and was silent in her heart, and continued:
"In the first stage of the implementation of the plan, Xiapu County's Zhengfu and Meigang will also join hands with the Provincial State Investment Corporation in Qingfeng District, Huaixi City to promote the construction of an electric power industrial park, mainly using Huaixi's cheap and abundant hydropower and coal power resources~www .wuxiaspot.com~ Carry out key investment promotion work for metallurgical, material and other high energy-consuming heavy industry projects, and promote the direct purchase of electricity between key industrial enterprises in the park and Dongjiang Power. Projects, these two projects with a total investment of one billion yuan, will be the first to start construction in the Electric Power Industrial Park, and the ultimate goal is to promote the extension of the economic belt along the Zhujiang River to the middle and upper reaches of Huaixi City..."
Xucheng Cement's new plant project also considered Huaixi in the early days. Later, after comprehensive consideration, the main consideration was to build a plant in Xinjin. Now it is transferred to Huaixi under the leadership of Huaihai Financial Investment.
In addition to targeting the rising building materials market in the middle and upper reaches of the Zhujiang River, it is also at this juncture that we want to balance the growth rates of the two ends of the Zhujiang River. project.
The middle and upper reaches of the Zhujiang River have been severely affected. If the economy is to recover in the second half of the year, it is also necessary to quickly start such an industrial park. For Meigang, if the approval of the ultra-high voltage project is blocked and delayed, the excess power capacity of nearly one million kilowatts after the implementation of the first phase of Dongjiang Power will also need to be released by such a heavy industry industrial park. At that time, in addition to smelting ferronickel in this industrial park, Meishan Iron and Steel can even build a larger-scale electric furnace steel production base in Huaixi.
Xie Zhi finished introducing the details. Seeing that her father and Hong Qi were silent, she also sighed in her heart. Shen Huai obviously made two preparations. At that time, Meigang and Dongjiang Electric Power could even take over some businesses of Huaineng to spin off and further strengthen themselves; if they had a strong surname, Shen Huai was not unprepared to entangle for seven or eight years or even ten years.
In fact, after thinking about this, it is not difficult to guess what Hongqi's father will do when he sees the old man.
You'll Also Like
-
Super God: Alliance system, summon nurse at the beginning
Chapter 199 4 hours ago -
Fairy Tail: I Created the Magical Internet
Chapter 350 4 hours ago -
In the comprehensive martial arts drawing of terms, every time it is a must to hit the conceptual le
Chapter 175 4 hours ago -
Daqing: Eternal life begins with accepting Fan Xian as your disciple!
Chapter 129 10 hours ago -
I, the Star Dome Railway, change everything
Chapter 270 10 hours ago -
Zongman: This butter is too real!
Chapter 162 10 hours ago -
Kuroko: Above the Miracle, Starting from Tonghuang
Chapter 120 10 hours ago -
Tomb Raider: From Awakening the Martial Soul to Collecting Treasures to Become an Ancient God
Chapter 147 10 hours ago -
People are monks in the island country, and black silk wives are mounts
Chapter 144 11 hours ago -
I am upgrading the entry in Dazhu Peak, I support my master's wife
Chapter 137 11 hours ago