After listening to Yu Danzhen's request for advice, Zhang Yunqing asked: "Then how many points did you randomly check the thickness of his concrete? What is the average thickness?"

Yu Danzhen replied quickly: "Mr. Zhang, I randomly checked his concrete thickness at 10 points. The average thickness is 9.98 centimeters, so I calculated the thickness of the concrete cushion for him based on the thickness of 100."

Zhang Yunqing then asked Bian Zhenjiadao, the owner of the garden construction team: "Do you have anything to explain about the situation Yu Gong mentioned?"

Bian Zhenjia, owner of the garden construction team, said: "There is something that needs to be explained. In fact, the problem of average thickness lies in the fact that there are indeed thinner places and thicker places. I think the current situation can be to increase the random inspection of concrete thickness. Spot on spot.”

Yu Danzhen asked in return: "The more points you spot-check where the concrete is thick, doesn't that mean your average thickness will be thicker?"

Bian Zhenjia, the owner of the garden construction team, asked: "Mr. Yu, your current random inspection data is very unfair to our suppliers. I request a re-spot inspection. The location selection and number of random inspection points need to be discussed by everyone."

Yu Danzhen replied: "It's okay to conduct random inspections again. If you think my random inspection method is not appropriate, you can come up with a plan that everyone agrees on now, and we will go to the site for review."

Bian Zhenjia, owner of the garden construction team, replied: "For the sake of fairness, we determine the number of random inspection points based on the total area occupied by the concrete cushion. For the time being, we will randomly inspect one point per thousand square meters. In this way, no matter how thick it is, the thickest ones will be selected." Calculate the thick ones, draw the thin ones and calculate the thin ones, and finally calculate based on the average thickness, okay?"

Yu Danzhen replied: "That's okay."

Zhang Yunqing said: "Although it is not perfect, there is no big problem. You can handle it according to this opinion. Are there any other problems? Boss Bian."

Bian Zhenjia, a member of the garden construction team, replied: "There are still some problems.

Mr. Yu only calculated the cost of leveling the site for me in all garden construction areas, but did not calculate the cost of excavation, filling and discarding of earthwork in the garden construction area? "

Yu Danzhen explained: "Mr. Zhang, this is what happened.

For areas such as flower ponds, tree ponds, pools, and curb stones in the garden area where there is obvious excavation and fill, I calculated the amount of excavation and fill for him according to the dimensions shown in the diagram, but he asked to calculate the amount of discarded square. In fact, I also asked, it was just dug out and dumped in the green area, and it was not actually abandoned outside.

I calculate other roadbed and large square areas as flat sites.

The calculation of the leveling site includes excavation, filling and leveling within plus or minus 30 centimeters. He wanted to calculate the excavation and fill volume after calculating this. We do not agree on this issue. "

Bian Zhenjia, a member of the garden construction team, replied: "Mr. Yu has explained most of the issues clearly. There is also a relevant factor. The unit price of the flat site in the contract is one yuan per square meter. It cannot be built at all. It is a loss-making price." . If the price can be calculated based on the amount of excavation and filling, assuming the average thickness is 30 centimeters, it can be calculated as more than two yuan per square meter. In this way, the price can be maintained without losing money. Can we change the pricing method? "

After listening to the conversation between the two, Zhang Yunqing replied: "I think what Boss Bian said makes sense. We can change the pricing method to flexibly handle the problems in the process, and correct them when confirming the output value, so as to avoid being unable to settle the account." Bullshit. This is my personal opinion. Let’s put it this way, the issues that Boss Bian mentioned today are not entirely something that we at the Ministry of Commerce can fully decide.

I suggest that Boss Bian come forward and ask Mr. Zhou, the project manager. Yu Danzhen and I first go to Mr. Zhao to briefly report the situation. Then, after you come to Mr. Zhao’s office, we can discuss it and jointly decide on the method for confirming the output value for you this time. in principle. "

Bian Zhenjia, the owner of the garden construction team, agreed: "Okay, I'll ask the project manager Mr. Zhou to go to Mr. Zhao's office."

Zhang Yunqing and Yu Danzhen took their notebooks and went to Zhao Manfu's office first, and gave Zhao Manfu a brief report on the opinions of the garden construction team boss Bian Zhenjia and the results of the three people's discussion.

Zhao Manfu said he understood the situation.

Soon, Bian Zhenjia, the owner of the garden construction team, invited project manager Zhou Wencheng to Zhao Manfu's office and found a seat to sit down.

Zhao Manfu asked Bian Zhenjia, the boss of the garden construction team, and said: "Boss Bian, Zhang Yunqing and Yu Danzhen have just given me a brief report on the controversial parts of your process of confirming this month's output value. Now you have the project manager Zhou Mr. Wencheng Zhou is also here. I want to hear you briefly describe, what is the problem? How do you want to solve it? "

After listening to Zhao Manfu's question, Bian Zhenjia, the owner of the garden construction team, sat up straight and leaned slightly forward. Zhao Manfu reported: "Mr. Zhao, the output value of our garden construction this month has been confirmed after it has been reviewed by the Ministry of Commerce. After the communication, there are still some controversial issues. There are three main ones. The first is the issue of confirming the thickness of the sand and gravel, the second is the issue of confirming the thickness of the concrete cushion, and the third is the issue of losing money in leveling the site."

Zhao Manfu asked with concern: "Boss Bian, during the current rush for work and under such a tense situation, it is normal for the thickness of your base layers to be uneven. How could there be a dispute when confirming the output value?"

Bian Zhenjia, owner of the garden construction team, explained: "For example, regarding the issue of confirming the thickness of the sand and gravel, Mr. Zhou of the project department is also here. You can ask whether the thickness of the sand and gravel we laid at that time was definitely enough to be 30 centimeters thick. Yes, right, Mr. Zhou?"

Project manager Zhou Wencheng laughed and replied: "When you lay it in pine, it is thick enough to be 30 centimeters, okay?"

Bian Zhenjia, the owner of the garden construction team, responded: "When paving loosely, it is enough to be 30 centimeters because the unit price reviewed by the company does not include this compaction factor. Of course, this is the only way I can do it."

Zhao Manfu asked Zhang Yunqing: "What does Boss Bian mean when he said that the unit price reviewed by this company did not include this compaction factor?"

Zhang Yunqing replied: "After checking the previous data files, when the company reviewed the bid price before the bidding, the bid price of the continuous sand and gravel did not take into account the compaction coefficient. This compaction coefficient has a relatively large impact on the amount of continuous sand and gravel. , it takes roughly 1.25 square meters to compact the continuous sand and gravel purchased at market price to produce the calculated amount of continuous sand and gravel for one side."

Zhao Manfu said angrily: "Then isn't this forcing someone to fake something?"

Zhang Yunqing replied: "Yes, there are always some self-righteous people in the company who are in charge of cost audits. If we insist on doing this, there is no way to solve it at the project department level, so we have to deal with the subcontractor's behavior of cutting corners. The only choice is to turn a blind eye."