Raise A Million Bees At The Beginning

110 The Bidding Was Successful, And The Groundbreaking Ceremony!

In the next few days, Li Yang kept an eye on the sales data of major flagship stores every day.

Unsurprisingly, sales of "Camellia Nectar" are slowly but steadily on the rise.

And "Plum Blossom Honey" ushered in a period of rapid sales growth, which is related to the beauty attributes of "Plum Blossom Honey".

Most people will choose "Plum Blossom Honey" as a substitute after losing "Hundred Flower Honey".

The original "Plum Blossom Honey" customer group plus the sudden "Hundred Flower Honey" customer group bought "Plum Blossom Honey" together, so it's no wonder that the sales volume did not increase.

Looking at the impressive sales results, Li Yang smiled, then took out a pack of cigarettes from his desk and lit one.

In the cloudy mountains and mist, Li Yang received a call from the people below, and the land assigned to the company in Linye Township had already been released.

After getting the news, Li Yang took the company's car and set off for Linye Township.

Linye Township is a bit far from here, and it would be somewhat tiring for Li Yang to drive there by himself, so it would be better to let the company driver drive him there.

Three hours later, Li Yang appeared in Linye Township. The large flat open space in front of him was the area officially assigned by Linye Township to build a factory for Li Yang.

This area is not to mention building a large factory with 1,000 people, but the number can be doubled several times. A large factory with thousands of people is fine, but the company does not need that much. It only needs staff dormitories, office buildings, and warehouse canteens.

There are also facilities such as factories.

Successively, Li Yang went to the "Chinese pagoda tree" forest with the accompanying personnel of Linye Township officials, and looked at the place where the beehives were left by the pagoda tree forest.

Basically, a large area was vacated, and the officials of Linye Township were still very concerned.

Finally, after seeing the sunflower fields and the pear groves, Li Yang stayed in Linye Township and had lunch with the officials after making sure there was nothing wrong.

The next thing is finalized, Li Yang needs to contact the construction company.

After returning to Pingyang District, Li Yang immediately asked someone to arrange a project bidding document.

For such a large project, the combined engineering funds will cost hundreds of millions of yuan.

This requires starting the process of "invitation and bidding", and the project is announced, and some construction companies are waiting to "grab" the project.

The construction company will draw up a design draft based on this project in detail and analyze how much money their company needs to complete the project, the completion date, etc., and these will be recorded in the "bidding document" at that time.

At that time, what Li Yang will do is to find a company with the lowest cost, good design, and strong strength among the "tenders" submitted by those construction companies to "win the bid".

A week later, Li Yang received all the project proposals for this "bidding fair".

A total of seven construction companies submitted "tenders", and one of them, Futian Construction Engineering, caught Li Yang's attention.

The price of their home is not the lowest, but it is also very low. It is the third from the bottom. The key is that the design draft of this Futian Construction Engineering Co., Ltd. has attracted Li Yang.

The factory on the design draft is simple but grand, with a lot of necessary facilities, and the space utilization rate is sufficient.

Moreover, the design of the staff dormitory and office building is completely outstanding.

They directly connected the staff dormitory with the office building. The front is the office building, and the rear is surrounded by a circle to connect the dormitory building. There are ten large spaces in the middle of which are basketball courts, badminton courts and table tennis courts.

Li Yang likes this design very much, and so many leisure food break facilities are also a model of the style of a modern company.

Finally, the cafeteria and warehouse are also very modernized, and the cost is also the third lowest among the seven companies.

After reading the bidding documents of Futian Construction Engineering, Li Yang carefully looked at the bidding documents of the other six companies.

None of the design drafts of Futian Construction could make Li Yang's eyes shine.

The project cost given by Futian Construction Engineering is 132 million, which is not low, but not too high.

The construction period was as short as possible as Li Yang said in the previous bidding meeting, which was two months.

The two-month period was forced by Li Yang. Otherwise, according to the normal construction speed, the construction of such a factory would start in half a year, and the construction period of one or two years is also normal.

Although it required them to work overtime, Li Yang also wanted to catch the first wave of spring nectar.

There is no way.

After thinking for a while, Li Yang asked his assistant to search the information of Futian Construction Engineering. If he was sure that the company was okay, Li Yang decided that the company that won the bid was Futian Construction Engineering.

After a while, Li Yang received a form handed over by his assistant, which showed that Foton Construction Engineering is a new company in the industry, has contracted many large-scale projects, and its strength has been recognized in the industry.

Seeing this, Li Yang directly spoke to the assistant and said:

".∼Contact the tenderer of Futian Construction Engineering and tell them that they have won the bid, and inform other companies that they regret losing the bid.

A few days later, the roar of an engine came from the originally quiet Linye Township.

The major engineering vehicles and construction equipment of Foton Construction Engineering were all settled in the open space designated for Liyang Biotechnology Co., Ltd.

Dozens of excavators and large forklifts are ready, and the engineering team is also present.

Li Yang took a group photo with people from Futian Construction Engineering and official representatives, and then participated in the groundbreaking ceremony.

This is going to be on the news, and the official representatives who came to participate in the groundbreaking ceremony are not only Lin Yexiang's "Pingyang City Handleman?" Zhao Zhizhi also appeared on the scene.

It can be seen that the authorities attach great importance to Li Yang and the others.

A group of people Li Yang and people from the city stood in the middle of the C position and took a group photo with a smile, and then each of them moved a shovel and the "groundbreaking ceremony" was completed.

Then a group of people applauded directly, Li Yang also smiled and shook hands with others.

In the end, Li Yang chatted with the officials for a while, and then officially left Linye Township.

Seeing that Li Yang took out a cigarette after the official left, Ji Yang was a little uncomfortable with this awkward feeling.

"President Li?"

Hearing the voice, Li Yang looked back, he was the boss of Futian Construction Engineering Co., Ltd., he is actually not very old, and those who get into his position usually start at 40 years old, and the average is 50 years old.

But the boss of Futian Construction Engineering is only in his thirties.

After saying hello, the two of them seemed to be chatting about the construction period. .

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like