Raise A Million Bees At The Beginning
190 Free Contract, Priority Renewal Right!
On the second day, Li Yang took people to drive to the "barren mountain", and An Yitian took people to "Gaojia Town".
If "Gaojia Town" can negotiate the construction of the company's subordinate bee farm, the honey production will definitely be greatly increased, which can effectively alleviate the current shortage of production.
And the key point is that if the bee farm in Gaojia Town is built and handed over to Foton Heavy Industries, the construction period will not be too long.
It can be put into production in a short period of time, and the effect of adding a large bee farm to the honey source will soon be reflected in the output, thereby driving the development of the flagship store.
As for the "barren mountain", even if Li Yang has negotiated with the official quickly, it will take a long time for the thorough development and construction to be completed.
Therefore, the bee farm in "Gaojia Town" is a top priority, and Li Yang is also very relieved to hand it over to An Yitian.
After arriving at the "barren mountain", Li Yang frowned. He always wore a mask when he got out of the car, because the wind and sand were too strong, and if he didn't wear a mask, the sand and dust would directly pour into his mouth.
I couldn't bear it at all, and the surrounding soil was loosened into dust after Li Yang stepped on it a little with his feet, which shows how serious the problem of soil desertification here is.
There are very few plants around, basically small weeds and the like.
After seeing this, several company executives behind Li Yang also underestimated in their hearts. If this place is developed, the investment will not be mentioned.
But Li Yang has a solid foundation in his heart. He has the "enhanced version of Haloxylon" saplings given by the system, as well as the bonus of "poplar guard", which is very suitable for transforming this land.
For such a large area of wasteland, the nearest town does not have the right to contract. It must be an official at the level of Pingyang City to have the right to decide.
After thinking for a while, Li Yang directly asked the accompanying technical team to release the "unmanned". Aircraft aerial photography of the situation here.
Then ask the assistant to contact the person in charge of this matter in Pingyang, and they will save face in the name of the company president.
After all, they said before that they would support the development of Li Yang Company as much as possible.
And Li Yang believes that there is no need for the authorities to refuse this matter, they will definitely agree.
Now someone stands up and turns the barren hills that they have been struggling with for many years into a sea of flowers. This is what they dream of.
On the way back to downtown Pingyang, Li Yang carefully checked the video data captured by the "drone" of the technical team, which was roughly the same as what Li Yang had seen before.
Such scenes are found in the entire area of more than 4,000 hectares in the barren mountain area, and earthy yellow is the main color here.
Moreover, the outermost part of the barren hills photographed by the "drone" has always been the hardest hit area by wind and sand. The strong wind from the northwest has been blowing over, not only bringing sand and dust, but also rolling up the soil here, causing land loss.
Therefore, the most urgent task for Li Yang is to use the "poplar guard" provided by the system to plant a circle around the outermost edge to form a wind and sand defense belt.
After confirming this point, Li Yang directly opened the system in his mind to check his honor value.
Characters: Li Yang
Honor value: 456.42 million (the character Li Yang can start the next round of lucky draw when the honor value reaches one billion)
System item: "Aspen Guard" (enhanced version of poplar sapling), ten honor points can be exchanged for one tree.
System Item: "Enhanced Haloxylon Tree" (Enhanced Haloxylon Tree Sapling). A point of honor can be exchanged for one tree.
I now have more than 400 million honor points close to 500 million. If I want to exchange these, it is more than enough, which is not a burden.
But it is a bit difficult to pick up the goods without letting others find out after the exchange is completed.
Thinking of this, Li Yang decided to hand over this matter to his assistant, and asked her to find a remote warehouse in the suburbs [I rented ten of them.
In remote places, there is no camera or the like, so that you can directly exchange the "White Poplar Guard" saplings and "Enhanced Haloxylon" saplings in the system space, and then directly "one-key seamless extraction" to the rented warehouse in.
Then when the time comes, just hand it over to Wang Zhen and his transportation team to pull it.
In the next few days, Li Yang met with many relevant people in Pingyang City, and then discussed the feasibility of this matter with them one by one.
Just as Li Yang thought, the people in charge of this matter in Pingyang fully support Li Yang's idea. After all, in their opinion, if Li Yang can really make it happen, it will be a great achievement
They can also shed tears.
If it can’t be done, it won’t be done. Li Yang’s company pays for the money and people, and the most they can do is provide support through various other channels.
And Li Yang also put forward his own request. Now it is not realistic to ask to build a water pipeline to the ".~barren mountain", so Li Yang asked Pingyang officials to provide water resources support.
The person in charge here was also straightforward. After a little thought, he decided to deploy a few water storage vehicles for the biotechnology company to dispatch around the clock.
And when necessary, for example, when planting saplings requires a lot of water, the water storage vehicles of the firefighting vehicles can also be used to support Li Yang and the others to meet their water needs.
After this problem is solved, Li Yang's next (great) request is for officials to coordinate and call for recruitment.
Because if Li Yang works on the "barren hills", it will take a lot of labor to build bee farms and plant saplings all over the mountains. At that time, Li Yang will pay for it, and the government will come forward to recruit to ensure the demand for labor.
The official has also agreed to this request, which is a good thing for them.
The last thing is that this barren mountain is officially contracted to Li Yang Company for free, with a time limit of 100 years, and the company has the priority to renew the contract after expiration in the name of the company.
After all, Li Yang did not do such a good thing as "the predecessors plant trees and the descendants enjoy the shade".
Ji Yang couldn't accept that he had worked hard to get the environment up and running for more than ten years, but someone else would settle in and enjoy the results.
You'll Also Like
-
Douluo: Undercover Wuhun Palace, who asked you to marry the Pope?
Chapter 290 11 hours ago -
Douluo: I can hear Qian Renxue's voice
Chapter 366 11 hours ago -
Peerless Tangmen: Dragon Bear Douluo
Chapter 153 11 hours ago -
Douluo: The Peerless Tang Sect dug out Yu Xiaogang
Chapter 212 11 hours ago -
Douluo started from being accepted by Bibi Dong as a disciple
Chapter 35 11 hours ago -
Douluo Continent on the tip of the tongue
Chapter 594 11 hours ago -
Douluo: My mother is the time traveler
Chapter 215 11 hours ago -
Douluo: Rebellious son of the Tang family
Chapter 668 11 hours ago -
Super synthesis system
Chapter 658 11 hours ago -
I want to be the overlord when I transform into Marvel
Chapter 1335 11 hours ago