reborn industrial empire

Chapter 740 East Leipzig

On one side of the city, there was a lot of commotion due to forced demolitions, but on the other side of the city, Jin Xiaoqiang had no time to spare and kept a close eye on Fang Shao and Yu Shaodong's every move.

After knowing that they were going to demolish, and that there would definitely be no good results, Jin Xiaoqiang no longer worried about their affairs, because he knew that relying on the radical personalities of these two people and their preference for unconventional handling

The way things are going, something will definitely happen in this demolition work, and all he has to do is wait.

Once there is a problem with their demolition work, the rest of the things can be solved easily, and all you have to do is just go with the flow.

During this period of time, he didn't have free time to spend with the two of them. He still had a lot of work to deal with. For example, what he needed to worry about most at the moment was the reconstruction and expansion of the factory.

Last year, Huayang Power formulated a new factory expansion plan. They are planning to build three new factories to increase the company's production capacity from the original 1.5 million vehicles to 3 million vehicles.

They will build two large-scale production bases with an annual output of 500,000 vehicles in Yangcheng, Yucheng and other places, and the current production capacity of Huayang Power Corporation will also be expanded, and the production capacity will be increased from the original one million vehicles.

1.5 million vehicles later.

The construction of new factories in Yangcheng and Chongqing has begun and is expected to be completed within two years. Relatively speaking, the expansion of local factories in the provincial capital is much more complicated. According to Jin Xiaoqiang's vision, the entire

The expansion and restructuring work will take three to five years to complete without affecting production as much as possible.

Once the reconstruction and expansion project of the entire factory is completed, the headquarters of Huayang Power Company will be a large-scale comprehensive industrial base integrating automobile manufacturing, machine tool manufacturing, special metal smelting, and equipment manufacturing.

The efficacy is no less than that of the Ruhr area in Germany. It can even be called the Leipzig of the East.

The reason why Jin Xiaoqiang had such an idea was entirely because he had visited Germany several times before to attend auto shows or when purchasing equipment, especially some of the latest models designed by the Germans.

Factory design.

In modern industry, if you want to improve efficiency and ensure product quality, you no longer think about it in the past. As long as you seriously focus on management and production, appropriate production lines and the latest production factory design will also

It is the key to improving product quality and improving work efficiency.

When Huayang Power was founded, the reason why it was able to quickly complete construction and start production was because they acquired the original Lao Nanyang No. 1 Machinery Factory, a time-honored state-owned enterprise, which left Huayang Power with

A very rich legacy.

At that time, Huayang Dynamics relied on these heritages to quickly complete production and construction, quickly produce its own products, and save a lot of trouble in factory design and construction.

This deal seemed very cost-effective at the time, but a few years later, especially after the rapid expansion of Huayang Power Company, these early factories were no longer enough from a modern perspective.

.

Especially after Jin Xiaoqiang visited some factories in Germany, he felt that if Huayang Power's current production lines and production workshops continue to operate like this, they may never be able to achieve further breakthroughs in the high-precision field.

This is entirely determined by the past and present production models, production technology, and the products produced.

In the early years, Nanyang No. 1 Machinery Factory relied on the design and construction of factories with the help of experts from the former Soviet Union, and quickly became the largest machinery manufacturer in the country. It is a highly comprehensive production unit.

There are metal smelting and manufacturing plants here, as well as raw material storage workshops. After the metal is produced, it can be directly sent to the processing workshop for processing, and then diesel engines, cars, tractors and other agricultural tools can be produced, and even rails and locomotives can be produced.

, and quite a few military products.

At that time, it was a giant enterprise that could support hundreds of thousands or even hundreds of thousands of people. It was a comprehensive and comprehensive enterprise that could produce any heavy industrial products.

But later, after more than 20 years of baptism after the reform and opening up, and the impact of a large number of private enterprises, this enterprise finally could no longer move forward and could only collapse to the ground, but the legacy he left behind was still very rich.

of.

Not counting machinery, equipment and factories, the land alone can make anyone jealous.

At the beginning of Huayang Power, the conditions here were indeed very suitable for the operation of Huayang Power. However, in the following years, some shortcomings of this factory began to be exposed.

For example, the conveying batching device of the production line and the machine tools they use are already very inappropriate for use in current factory workshops.

Especially the machine tool processing and equipment manufacturing industry that Jin Xiaoqiang values ​​​​very much are very inappropriate in the original factory building of this factory.

For example, the modern airport processing industry, especially the high-precision machine tool processing and equipment manufacturing industries, has very strict requirements for factory buildings.

Not to mention other things, the land requirements are very strict. Everyone knows that when machine tools are used in modern mechanized manufacturing industries, the machine tools often produce certain vibrations when processing certain workpieces, and these vibrations will

After being transmitted to the ground through conduction, the ground will generally feed back a restoring force, and this restoring force will bring some slight vibrations that are difficult for our human bodies to feel, but these vibrations can be felt by machine tools that require high-precision processing.

, and this kind of vibration often affects the accuracy of processing.

Moreover, recently in Nan#yang City, large-scale construction and real estate development are taking place everywhere, and demolition is taking place in many places. When some buildings are demolished, blasting operations will be carried out.

The shock waves generated by these blasting operations will be transmitted through the ground. When these shock waves are transmitted to Huayang Power's high-precision robot processing production lines, they will seriously affect the accuracy of the workpieces they process.

Moreover, for the machine tool and equipment manufacturing industry, which Jin Xiaoqiang has always been ambitiously optimistic about, these industries need to ensure the processing accuracy even more, and the vibration transmitted from the ground will have a great impact on the processing accuracy of this industry.

Therefore, if you want to take a further step in the industrial industry, let alone anything else, you will have to put a lot of effort into the foundation of this factory.

When the time-honored Nanyang No. 1 Machinery Factory was originally built, these things were not considered at all, let alone ground backfilling. In addition, the industrial products produced by the former Soviet Union at that time were also considered stupid.

The main features were rough shapes, so when the factory was designing them, they didn’t consider the issue of processing accuracy at all.

But in today's industry, where the requirements for processing accuracy are getting higher and higher, it is obvious that these old factory facilities are no longer suitable.

This is also the main reason why Jin Xiaoqiang proposed to reconstruct the original old Nanyang No. 1 Machinery Factory. The new factories built in Yangcheng and Chongqing will be built in full compliance with the latest international technical standards, and the head office will also fully

Can't fall behind.

Now Huayang Dynamics’ market share and sales volume are constantly increasing. If this problem is not solved, they will face huge problems in the future, especially the quality of products and the productivity of defective products, which will bring great consequences to the company.

There will be a big loss.

Last year, Jin Xiaoqiang proposed to rebuild and expand part of the new factory. This proposal was approved by many senior leaders at the company's middle and high-level meetings. After all, most of the company's management personnel who understand technology and management have

With the experience of studying abroad and working in large overseas manufacturing companies, they have seen the production lines of foreigners and the construction standards of new factories. If Huayang Power wants to become bigger and stronger, it must build on the basics.

It's like being on par with the world's top players.

Jin Xiaoqiang is also a proud and arrogant character. If he doesn't work, he will be pulled down, but if he wants to work, he must do his best. This is his business philosophy.

So after specifying the plan, Huayang Power dispatched many teams last year to visit Germany, Japan, and the United States. After a round of inspections, they finally decided to use German design models to build their new factory.

.

After the inspection at the beginning of last year, they invited a design team from Germany to inspect their factory site and then carry out the design.

After all, the Nan#yang No. 1 Machinery Factory occupied a very large area back then. The production area used by Jin Xiaoqiang and others now is only a quarter of the original factory. Therefore, if a new factory and workshop are built, the remaining area will be

carried out on land.

In August last year, the German designer team finally came up with the latest design drawings. The design standards of the new factory will be completely implemented in accordance with the specifications of BMW's Leipzig factory.

The first phase of the new factory will invest 9 billion yuan, covering an area of ​​2.07 square kilometers, equivalent to ten bird's nests. The automation rate will reach more than 95%, the water circulation rate will reach 90%, and the production

The craftsmanship is even on par with Rolls-Royce.

The annual production capacity of the first phase will reach an annual output of between 1 million and 1.2 million vehicles, which can cover all models of Huayang Power...

At that time, when Jin Xiaoqiang saw this detailed plan, he was also excited. Finally, a new, brand-new, completely world-class large-scale automobile manufacturing plant was about to be born in his own hands.

If this factory can really be completed, then it can be called the Leipzig of the East...

{PiaoTian Literature www.PiaoTian.com thanks all book friends for their support, your support is our greatest motivation}

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like