Trillion Market Capitalization is not a Dream

Chapter 158 What’s the reason?

After surveying engineer Lin Jun ended his hurried conversation with Li Xixuan, he hurriedly came to the opposite side of Zhang Yunqing's desk and said to Zhang Yunqing in a panic: "Mr. Zhang, do you have time now? Please, please." Please help me, I'm encountering some problems with the earthworks on site now, something has gone wrong, and I need your help."

Zhang Yunqing stood up and comforted Lin Jun, the surveying engineer: "Hello, Lin Jun. Sit down first and speak slowly. Don't be anxious."

"OK."

"Lin Jun, under normal circumstances, your on-site engineering matters are all arranged by the production side. What situation do you have now? Do you need support from our business department? Speak slowly, don't worry, So that I can hear you more clearly."

"That's it, Mr. Zhang, don't we have two earthmoving teams in our project department?"

"Well, I learned a little bit of information."

“One is backfilling with outsourced ordinary soil.”

"Um."

“The other one does backfilling with purchased planting soil, right?”

"Um."

"As for these two earthmoving contracts, I have learned about the supplier's unit name information through the capital plan. There are only two earthmoving suppliers, so I haven't read the details of their specific contracts, so they I can’t remember the specific content of the contract. Please tell me specifically, what do you want to know and what specific help do you need from our department?”

"It's like this, Mr. Zhang. These two earthwork teams, especially the team that supplies planting earth, are a bit unable to get the planting soil. If he can't come, we want to urge him to bring in the planting soil as soon as possible.

Then a week ago, I started urging him, many times every day, and until now, he has been unable to get in the planting soil during such a tight construction period.

I think this problem is more difficult to solve.

How about you go to the scene with me, and we can communicate with each other together.

By the way, would you like to know the condition of the earthwork at the site? "

"Well, that's okay, but I don't know their specific situation right now. Maybe if I go now, I can at most listen to what he has to say, and then come back to the project department after listening, and we will report this situation to the relevant internal personnel. After explaining it clearly, we can then discuss a way to reply to them. Do you think this is okay?"

"That's okay, Mr. Zhang."

"Have you told the project manager Zhou Wencheng about the situation of your earthmoving team?"

"This situation needs to be reported to the project manager Zhou in a timely manner every day. Isn't this really hopeless? He asked me to come to you for the business aspect. I hope you can give me more support in my work."

"Um."

"To put it bluntly, the back and forth between these earthworkers and the on-site management staff of our project department is mostly about money. They complain at the site every day. What they mean is, well, the earthworks can't enter the site. Either the cost has increased, or someone else has blocked the road and refused to let them pass. Sometimes it rains and the soil cannot be dug out. I still don’t understand why they keep doing this. It’s clear. Let’s go to the scene and see it together, maybe we’ll understand it once we hear it.”

"Then as you said, hurry up and lead the way.

"

After surveying engineer Lin Jun and Zhang Yunqing agreed to go to the site, they walked outside the office and led the way. Then the two got into a car rented by the project department driven by surveying engineer Lin Jun and arrived at the east gate of the construction site.

After Lin Jun, a surveying engineer, parked his car on the side of the road at the east entrance of the construction site, he got out of the car and called the boss of the earthwork planter: "Boss Yang, come here."

"Mr. Lin, where are you coming from? Where are you?"

"Oh, go to the center of the large flower pond at the east gate. There is a pavilion here. The east gate has the only pavilion. There is a place for you to backfill with planting soil. Half of the flower pond has been built at this location. Right That’s right, we’ll communicate in person again then.”

Surveying engineer Lin Jun said to Zhang Yunqing: "I just called Boss Yang who supplies planting soil."

"Well, Boss Yang, okay, does he promise to come to where we are now?"

"Well, he agreed. This earthwork boss is too ridiculous. I'll call him over first. Then you can see what he says."

When Boss Yang arrived, he looked like a tall, fat man from a distance, with a bulging belly. Yes, the belly of a son who is ten months pregnant is bigger than that of a normal person. This is not an exaggeration at all. You can picture this in your mind.

Surveying engineer Lin Jun was preparing to introduce the two of them when Boss Yang arrived next to him.

Boss Yang, the supplier of planting soil, enthusiastically and proactively complained to Lin Jun, the surveying engineer: "Oh, Mr. Lin, our transportation fleet has not seen planting soil for a week. You, the soil has increased so much now." Price, how do you think this should be done?"

The measurement engineer comforted Boss Yang and said: "Boss Yang, don't worry, let me introduce to you. This leader is the commercial person in charge of our project department. Well, at the same time, he is also the commercial person in charge of the area. Mr. Zhang, this It’s Boss Yang, the person in charge of earthwork who supplies planting soil for our project.”

Boss Yang moved half a step forward and exchanged a simple handshake and polite greetings with Zhang Yunqing.

Then, survey engineer Lin Jun continued: "After you two have gotten to know each other, I will continue to talk. I just invited Mr. Zhang to the site where planting soil needs to be backfilled immediately, and then I invited you, Boss Yang, too. I just want to hear what your thinking is, Boss Yang. When I went back to the office to see Mr. Zhang to report on your earth supply work, I couldn’t explain clearly why your planting soil couldn’t come in. , and then why the price needs to be increased, I just can’t figure it out, maybe it’s a professional reason. Well, so I invited Mr. Zhang, the business person in charge, to come over. Boss Yang, please have a good communication with Mr. Zhang. Try to Explain the situation clearly and clearly.”

Boss Yang chuckled and said, "Mr. Zhang, please give me a lot of support. Well, my earthwork work is very difficult."

Zhang Yunqing replied calmly: "Well, Boss Yang, don't worry, those who should support will definitely support it. Because isn't the project department now rushing for work? You must also do your best to support the work of the project department and give full play to the role of your local enterprises." Advantages. I heard from Mr. Lin that the planting soil you purchased from outside was rushed to you for a week, but you couldn’t get it in. What’s the reason? Tell me about it.”

Boss Yang said: "Well, this is the earthwork now. Well, didn't I sign the contract with you here? Then my planting soil has to be pulled out from their Changtian Village, and then pulled out on the road. ,there are some problems."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like