Trillion Market Capitalization is not a Dream

Chapter 97 Be prepared to introduce new garden construction teams

Zhou Wencheng continued to ask: "In addition to the quality of the earthwork, are there any other problems?"

Greening engineer Cui Yong replied: "There are still problems. The planting workers did not master the technology properly during the planting process. First, the integrity of the soil ball was destroyed. Second, the planting soil under the soil ball was not backfilled in place, and some formed The lack of pores directly causes the plants to be unable to absorb nutrients in the empty parts, accelerating the death process of the seedlings.

In the process of setting up supports after planting, the method is wrong. Many workers directly use nails to fix the support poles to the main poles of the plants. In this way, although the main poles of the plants are fixed, the plants are still alive. , needs careful care, just like nailing something to a person's body, it will cause physical discomfort to the plant, and then cause disease. Causes increased plant mortality.

In addition, each plant needs to be watered with root water after it is planted. One is to water it in time, and the other is to water it at a temperature that cannot be too high. Some workers do not water the seedlings for several days after they are planted. Some workers water the seedlings when the sun is shining. The water is hot to the touch. Pouring this kind of water is equivalent to watering the plants. The same principle applies to drinking boiling water, which can easily burn the plants directly.

There is also the problem of watering. Within a month after the plants are planted, the plants must be maintained and watered in a timely and continuous manner. However, many workers are lazy and do not water the plants if they are not careful, leaving the plants already planted. Many plants died of thirst. "

Zhou Wencheng asked: "You have a lot of problems related to greening mortality. Is there any solution?"

The greening engineer replied: "There is a solution. This requires Mr. Zhang to start with the cost. Whoever is responsible will suffer economic losses. After such strict implementation for a period of time, everyone gradually got used to it and improved their understanding of the cost." Providing product quality awareness can fundamentally solve the problem. Otherwise, by doing so, they have maximized their own interests, but seriously damaged the company's interests. If they do not control it, it is no exaggeration to say that , it is entirely possible that the entire project will suffer a loss.”

Zhou Wencheng asked Zhang Yunqing: "Mr. Zhang, please see how to solve this problem."

Zhang Yunqing replied: "This issue is quite complicated. After the meeting, I will discuss it with Cui Gong to find out the crux of these problems, study the contract agreements of their relevant units or individuals, and provide a feasible and down-to-earth solution." "

Zhou Wencheng nodded and replied: "Okay. I also hope that the problem will be solved as soon as possible. There are many and urgent things. Everyone should work overtime. We must solve the big problems in advance. Otherwise, the consequences of production will be unacceptable to the project department and the company." of.

Are there any other questions about greening? "

Greening engineer Cui Yong replied: "No more."

Zhou Wencheng arranged: "Then, the next construction engineer of the park, Wan Cong, you have to tell me."

Wan Cong was about to fall asleep. When he heard Zhou Wencheng calling him, he replied sheepishly: "Sorry, Mr. Zhou has been working overtime for too long during this period. His mental state is not very good. He was distracted just now."

Zhou Wencheng looked more distressed and said: "Wan Cong, during this period of rush for work, it is very busy. I often see you working overtime until late at night, and you have to get up very early in the morning to go to the construction site to arrange work. Long overtime work will delay Our bodies are broken. In the future, we should try our best to find free time during work to rest and restore our energy and energy. I was distracted just now, so I will tell you again. It’s your turn to talk about the work of garden construction. The key point is to talk about The work content related to the commercial person in charge of the project department facilitates Mr. Zhang to quickly understand the work related to the garden construction on the project.

"

Wan Cong twisted his neck, rubbed his temples and replied: "Okay, thank you Mr. Zhou for your understanding and concern.

Let me talk about the work on garden construction. Our project now has two main garden construction work teams, and their number of workers has been fixed at more than 40 and 50 people for a long time. This number of workers is estimated to not be able to meet the construction deadline requirements proposed by the current construction party.

After many times of communication and coordination, no clear reply was obtained.

Instead, they heard that because we arranged to rush for work, they requested information on increasing the contract unit price.

If it is necessary to rush for work according to the requirements of the builder, it is recommended that the company be prepared to introduce a new garden construction team and allocate construction areas that the existing team cannot take care of to the new team for implementation. "

Zhou Wencheng arranged: "This suggestion is okay, I agree. It depends on whether the district leader, Mr. Zhao, agrees."

Zhao Manfu replied: "I also think Wan Cong's opinion is good. The specific implementation of the project department, Mr. Zhou, will be responsible for the coordination and arrangements. Where support from the area is needed, just talk directly."

Zhou Wencheng replied: "Okay. Thank you Mr. Zhao for your support of the project department.

Wan Cong, you raised this opinion, do you have more detailed opinions and solutions? "

Wan Cong asked: "Mr. Zhou, what do you mean by more detailed opinions?"

Zhou Wencheng said: "For example, it is necessary to introduce a new team, what areas can the new team do, what is the approximate amount of work, how much time is planned to be completed, etc."

Wan Cong replied: "I understand it this way. The area that the current construction team cannot take into account is more than 20,000 square meters. It needs to be completed within two months. On average, each major project will complete 20 square meters per day. Calculated in square meters, it requires more than 1,000 working days. Divided by 60 days, it takes 16.7 workers per day. However, there may be wind and rain in the middle and construction will not be possible, and new teams need to be prepared for the entrance. time to actual implementation, as well as the impact of other unforeseen factors.

Therefore, it is recommended to introduce a new team with more than 25 large workers, and the number of small workers to cooperate should be allocated by the boss of the new team based on the actual situation. "

Zhou Wencheng said: "Your analysis is relatively clear, so let's act according to this opinion. Do you have the resources for the new team now?"

Wan Cong replied: "Mr. Zhou, I currently do not have such new team resources."

Zhou Wencheng said: "I have information about several paving teams here. After the meeting, you can ask me to get their contact information and ask them to come to the project department to see the situation and discuss it. If they are really interested and have the ability to complete the task, Yes, I will introduce him to Mr. Zhang for price negotiation."

Wan Cong replied: "Okay. In addition to the need to introduce new teams, there are still some small problems."

Zhou Wencheng asked: "If you have any small questions, just tell me directly."

Wan Cong replied: "The project department's on-site garden construction team also had some on-site visa issues. In the past, we had been delaying the written confirmation procedures for them, and now it has affected their enthusiasm for work."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like